F-16 Circuit Card Assembly NSN: 5998-01-629-5711WF

SOL #: FA8212-26-Q-0004Sources Sought

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Air Force
FA8212 AFSC OLH PZABA
HILL AFB, UT, 84056, United States

Place of Performance

Place of performance not available

NAICS

Bare Printed Circuit Board Manufacturing (334412)

PSC

Electrical And Electronic Assemblies; Boards, Cards, And Associated Hardware (5998)

Set Aside

No set aside specified

Timeline

1
Posted
Jan 21, 2026
2
Last Updated
Mar 16, 2026
3
Response Deadline
Mar 24, 2026, 9:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Air Force is conducting a Sources Sought Synopsis (SSS) for F-16 Circuit Card Assemblies (NSN: 5998-01-629-5711WF). This is market research to identify qualified manufacturers for a future Firm-Fixed-Price contract. The government seeks industry recommendations on delivery times and to assess competition, particularly among small businesses. Responses are due March 24, 2026, at 3 PM MST.

Scope of Work & Key Requirements

The requirement is for 43 units of the Circuit Card Assembly, ESDC, a sub-part of the F-16 C/D aircraft's (F100-PW-229 engine) Throttle Control System. Manufacturers must meet AS9100 standards and possess CMMC Level II self-certification. A Technical Data Package (TDP) is available but is export-controlled, requiring verification of an active DD Form 2345 for access. Foreign participation is not allowed.

Contract Details & Submission

  • Contract Type: Anticipated Firm-Fixed-Price (FFP).
  • Period of Performance: To be determined.
  • Response Deadline: March 24, 2026, 3 PM MST.
  • Submission Method: Submit a capability statement and answers to specific questions via email to Leslie Evans (leslie.evans.1@us.af.mil) and Brandon Moses (brandon.moses.1@us.af.mil).
  • Evaluation: Responses will inform future acquisition planning and potential set-aside decisions.

Technical & Compliance Requirements

  • Engineering Data: Unmarked engineering data must be treated as "DISTRIBUTION D" (DoD and US DoD contractors only) and is subject to export control regulations.
  • Packaging: Compliance with MIL-STD-2073-1, MIL-STD-129, and ISPM 15 (for wood packaging material) is mandatory, including ESD protection.
  • Transportation: F.O.B. Destination for data/first article. Bidders must coordinate with DCMA Transportation for shipping instructions using the SIR eTool System.
  • Deliverables: A Counterfeit Prevention Plan (CPP) (CDRL A001, DI-MISC-81832) is required within 30 days of contract award.

Qualification Requirements

Potential sources must satisfy Manufacturing Qualification Requirements (MQR). This includes:

  • Notifying intent to qualify and submitting a Source Approval Request (SAR) per AFMCI 23-113.
  • Possessing necessary facilities, equipment, tooling, and personnel.
  • Having a complete data package, including specific Air Force drawings (201126351, 20156881, 20156882).
  • Submitting a qualification test plan and report (estimated $5,000 cost, 180 days completion).
  • Providing a pre-contract award qualification article.
  • Waiver criteria (QWC1-QWC4) are available. Failure to meet MQR will render a proposal ineligible.

Additional Notes

This is Amendment 01, extending the response period. The government is seeking industry recommendations for delivery schedules (minimum 3 units per month) and potential acquisition strategies.

People

Points of Contact

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 3
Sources Sought
Posted: Mar 16, 2026
View
Version 2Viewing
Sources Sought
Posted: Feb 19, 2026
Version 1
Sources Sought
Posted: Jan 21, 2026
View