F-16 Manual Trim Panel
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Defense Logistics Agency (DLA) Aviation at Ogden, UT, is soliciting proposals for 8 F-16 Manual Trim Panels (NSN 6615-01-450-2802 WF, P/N 16C0650-803 / AM3773-6). This is a Firm Fixed Price acquisition restricted to currently qualified sources, but new US contractors are encouraged to pursue qualification. Proposals are due February 20, 2026.
Scope of Work
The requirement is for the procurement of 8 units of the F-16 Manual Trim Panel. Manufacturing must adhere to detailed engineering data requirements, including specific materials (SAE AMS-QQ-A-250/4), marking per MIL-STD-130 (including CAGE, P/N, Serial Number, and 2D Matrix), and compliance with the Air Force's lead-free solder policy. Packaging and marking must follow MIL-STD-2073-1, MIL-STD-129, ISPM 15 for wood packaging, and regulations for hazardous materials. A Counterfeit Prevention Plan (CDRL A001) is a required deliverable within 30 days of contract award. IUID is required.
Contract Details
- Contract Type: Firm Fixed Price for Item 0001.
- Quantity: 8 EA.
- Product Service Code: 6615 (Automatic Pilot Mechanisms And Airborne Gyro Components).
- Quality Assurance: Higher Level Contract Quality Requirements, ISO 9001:2015.
- Transportation: F.O.B. Destination from Continental United States (CONUS) sources.
- Set-Aside: Restricted to qualified sources: Lockheed Martin Corp (CAGE 81755) and Bowmar LLC (CAGE 99479). US Contractors Only.
Qualification Requirements
Contractors desiring to become a qualified source must submit a qualification package. This process involves:
- Prequalification notice and certification of facilities, testing, and inspection capabilities.
- Possession of a complete data package, including specific Lockheed Martin drawings.
- Manufacturing/process verification conforming to ESA-approved data, including UID.
- Submission of a qualification test plan and report for government approval.
- Provision of a pre-contract award qualification article for evaluation.
- Estimated Qualification Cost: $100,000.00.
- Estimated Qualification Time: 365 days for engineering support activity. Specific waiver criteria for qualification requirements are also outlined.
Submission & Evaluation
- Proposal Submission Deadline: February 20, 2026, before close of business.
- Evaluation Criteria: Price or Cost is the primary evaluation factor, significantly more important than other factors.
- Contact: Travis Bodily (travis.bodily@us.af.mil).