F--Gas/Oil Well Plugging at CUVA

SOL #: 140PS126B0003Award Notice

Overview

Buyer

Interior
National Park Service
DOI, NPS CONOPS STRATEGIC
Washington, DC, 20240, United States

Place of Performance

Place of performance not available

NAICS

Support Activities for Oil and Gas Operations (213112)

PSC

Hazardous Substance Removal, Cleanup, And Disposal Services And Operational Support (F108)

Set Aside

No set aside specified

Timeline

1
Posted
Dec 18, 2025
2
Last Updated
Apr 17, 2026

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The National Park Service (NPS), under the Department of the Interior, is issuing an Invitation for Bid (IFB) for Gas/Oil Well Plugging and Site Reclamation at Cuyahoga Valley National Park (CUVA), Summit County, Ohio. This 100% Total Small Business Set-Aside opportunity seeks contractors to plug and abandon two orphaned oil and gas wells and restore the sites. Bids are due by March 31, 2026, at 1:00 PM ET.

Scope of Work

The contractor will furnish all labor, equipment, materials, and transportation to replug and abandon two orphaned oil and gas wells drilled before the park's establishment, utilizing FY25 BIL-ECRP funds. Key tasks include:

  • Filing Ohio Department of Natural Resources (ODNR) work permits and obtaining landowner passthrough permits.
  • Developing and submitting a plugging and reclamation plan for NPS and ODNR approval.
  • Preparing and submitting a Safety Plan detailing preventative and responsive measures, especially for H2S presence.
  • Constructing temporary access routes and coordinating access with landowners.
  • Performing hot taps on wellheads/casings to verify plugging status and pressure.
  • Reentering and replugging wells, ensuring proper cement plugs.
  • Cutting surface casing, installing a surface marker with Well ID, and measuring methane levels.
  • Cleaning up and removing surface equipment, purging/capping flowlines within 200 feet of wellsites.
  • Removing and properly disposing of casing stubs, debris, tanks, separators, and flowlines.
  • Filing plugging reports for the state of Ohio.
  • Restoring the area to its natural contour, clearing debris, and reseeding.
  • Removing surface transmission lines or flowlines to at least 12 inches below ground.

Contract & Timeline

  • Contract Type: Firm Fixed Price (IFB).
  • Period of Performance: 180 days after Notice to Proceed (NTP), approximately April 8, 2026, to October 9, 2026. ODNR permit approval is anticipated to take 90 days before NTP.
  • Set-Aside: 100% Total Small Business Set-Aside.
  • NAICS Code: 213112, size standard $47 Million.
  • Product Service Code: F108 - Hazardous Substance Removal, Cleanup, And Disposal Services And Operational Support.
  • Bid Due Date: March 31, 2026, by 1:00 PM ET.
  • Contact: Cole Johnson (cole_johnson@ios.doi.gov, 2673210342).
  • Wage Determination: Davis Bacon WD OH20260001, effective 01/02/2026, applies.
  • Bid Guarantee: Required, 20% of bid price, not to exceed $3M.

Evaluation

Award will be made to the responsible bidder whose bid is most advantageous to the Government, considering only price and price-related factors.

Special Requirements & Notes

  • Availability of Funds: The contract is contingent upon the availability of appropriated funds (FAR Clause 52.232-18).
  • Subcontracting: Bidders must submit a worksheet demonstrating compliance with FAR Clause 52.219-14 regarding subcontracting labor cost percentages.
  • Site Visit: An original site visit was held on February 17, 2026. No second official site visit will be held, but independent visits are permitted outside restricted areas.
  • Clarifications: Consolidated Q&A clarifies requirements for copper AWG 12 wiring, post-award Safety Plan for H2S, contractor coordination for access roads, NPS handling of protected bat habitat trees, contractor responsibility for ODNR permits, and a 25-foot buffer zone near railroad tracks. All contaminated cleanup materials must be stored and disposed of properly.

People

Points of Contact

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 5Viewing
Award Notice
Posted: Apr 17, 2026
Version 4
Solicitation
Posted: Mar 19, 2026
View
Version 3
Solicitation
Posted: Mar 17, 2026
View
Version 2
Solicitation
Posted: Feb 9, 2026
View
Version 1
Pre-Solicitation
Posted: Dec 18, 2025
View
F--Gas/Oil Well Plugging at CUVA | GovScope