F--Limited sources justification for technical support services
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The National Park Service (NPS) has issued a Limited Sources Justification (LSJ) for the procurement of additional technical support services for the East Potomac Park (EAPO) Soil Storage Project. This justification, in accordance with FAR 8.405-6(a)(2), explains the intent to continue services with Jacobs Engineering Group, Inc. as a logical follow-on to their original, competitively awarded order. The LSJ was published on February 27, 2026.
Scope of Work
The required services involve ongoing environmental technical support for contaminated site matters related to the EAPO Soil Storage Project. This includes:
- Monitoring the import of soil and materials.
- Collecting samples for analysis.
- Preparing necessary documentation.
- Additional sample collection, surveying, and ecological risk assessment due to evolving project needs.
Contract & Timeline
- Type: Limited Sources Justification (LSJ)
- Set-Aside: None specified (justification for specific vendor)
- Published: February 27, 2026
Justification Details
The NPS justifies continuing with Jacobs Engineering Group, Inc. due to economy and efficiency. Jacobs was the original contractor for this project, awarded competitively, and has been exclusively responsible for the monitoring and sampling work. The justification highlights that the proposed action is a logical follow-on, citing challenges for new contractors, such as expedited scheduling and the need for immediate familiarity with NPS protocols and the project's evolving requirements. While the document acknowledges the existence of other contractors, it emphasizes the efficiency of maintaining continuity with the incumbent for this specific phase.
Additional Notes
This LSJ indicates that while the current phase is being awarded on a limited source basis, there are no systemic barriers to future competition for subsequent acquisitions related to similar environmental technical support services. Bidders interested in such services can use this document to understand the NPS's procurement strategy and justification process for ongoing projects.