FAA Western & Central Facility Demolition, Removal and Restoration

SOL #: 6913G626R200004Combined Synopsis/Solicitation

Overview

Buyer

Transportation
Office Of The Secretary
6913G6 VOLPE NATL. TRANS. SYS CNTR
CAMBRIDGE, MA, 02142, United States

Place of Performance

Tulsa, OK

NAICS

Site Preparation Contractors (238910)

PSC

Other Environmental Services, Studies, And Analytical Support (F999)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Apr 10, 2026
2
Submission Deadline
May 5, 2026, 5:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Federal Aviation Administration (FAA), through the Volpe National Transportation Systems Center, is soliciting proposals for Demolition, Removal, and Restoration Activities at three FAA facilities: TJY OM (Tulsa, OK), RVS OM (Tulsa, OK), and DEN TANK (Denver, CO). This Total Small Business Set-Aside opportunity involves removing environmental hazards, demolishing structures, and restoring disturbed areas at sites no longer in use. Proposals are due May 5, 2026, at 1:00 PM Eastern Time.

Scope of Work

The selected contractor will be responsible for conducting all demolition, debris removal, disposal, and site restoration activities in accordance with federal, state, and local requirements. Key tasks include:

  • Demolition, disposal, and restoration of structures and infrastructure at the specified sites.
  • Removal of environmental hazards, including presumed lead-based paint on OM antennas.
  • Preparation and submission of a draft and final Demolition, Removal, and Restoration Work Plan, which must include a Site Safety and Health Plan (SSHP) and a Risk Management Plan.
  • Obtaining all necessary local, state, and federal permits for demolition work.
  • Submission of a site close-out report containing all waste manifests, chain of custody paperwork, laboratory results, and before/after photographs.

Contract & Timeline

  • Type: Firm-Fixed Price (FFP) Purchase Order
  • Period of Performance: From date of award to September 30, 2026
  • Set-Aside: Total Small Business
  • Proposal Due: May 5, 2026, 1:00 PM Eastern Time
  • Questions Due: April 15, 2026, 3:00 PM Eastern Time
  • Published: April 10, 2026

Submission & Evaluation

Proposals/quotes must be submitted via email to roland.regan@dot.gov. Offerors are required to submit a detailed cost buildup for CLINs 00100-00400. The acquisition will be evaluated based on price and other factors, with price being the most advantageous to the Government.

Additional Notes

The work is detailed across eleven attachments, including the Statement of Work (SOW), Special Contract Terms and Conditions, FAR/TAR Clauses, Site Survey Reports for each location, Offerors Proposal Instructions, and a Pricing Sheet. Security access for the DEN TANK site requires a REAL ID-compliant form of identification or a U.S. Passport.

People

Points of Contact

Files

Files

Download

Versions

Version 1Viewing
Combined Synopsis/Solicitation
Posted: Apr 10, 2026
FAA Western & Central Facility Demolition, Removal and Restoration | GovScope