Fabrication Shop-Steam Plant Control Enclosure Items

SOL #: PR444206Combined Synopsis/Solicitation

Overview

Buyer

Energy
Energy, Department Of
ORNL UT-BATTELLE LLC-DOE CONTRACTOR
Oak Ridge, TN, 37831, United States

Place of Performance

Oak Ridge, TN

NAICS

Sheet Metal Work Manufacturing (332322)

PSC

Miscellaneous Power Transmission Equipment (3040)

Set Aside

No set aside specified

Timeline

1
Posted
May 5, 2026
2
Submission Deadline
May 13, 2026, 8:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

Oak Ridge National Laboratory (ORNL) is requesting Firm Fixed Price proposals for Fabrication Shop-Steam Plant Control Enclosure Items. This opportunity seeks to procure a range of electrical and sheet metal components for their facility in Oak Ridge, TN. Award will be made to the lowest priced, technically acceptable offer. Proposals are due by May 13, 2026, at 4:00 PM EST.

Scope of Work

The requirement involves the fabrication and supply of specific items, including HOF WallMount Type 4, 12 Enclosures, HOF Back Panels, Hoffman magnets, various Phoenix Contact components (such as DIN rails, terminal blocks, surge protection devices, fuse plugs, and power supplies), UL489 Miniature Circuit Breakers, CompactLogix controllers and modules (e.g., 2 MB ENet Controller, DC Power Supply, Analog Input, Digital I/O modules), and assorted electrical bus fuses and an Ethernet switch. The solicitation specifies that FAR 52.211-6, "Brand Name or Equal," applies.

Contract Details

  • Contract Type: Firm Fixed Price (FFP)
  • Set-Aside: No Small Business Set-Aside
  • NAICS Code: 332322 - Sheet Metal Work Manufacturing
  • Place of Performance: Oak Ridge, TN, United States
  • Department/Agency: Department of Energy (DOE) / ORNL UT-BATTELLE LLC-DOE CONTRACTOR

Submission & Evaluation

  • Proposal/Quote Submission Deadline: May 13, 2026, by 4:00 PM EST
  • Questions Due Date: May 11, 2026, by 4:00 PM EST. Questions must be submitted in writing via email to the primary contact.
  • Offer Validity Period: 120 days
  • Evaluation Criteria: Lowest priced, technically acceptable proposal.
  • Required Submissions: Offerors must provide a firm fixed price quote with a proposed delivery schedule. Mandatory attachments include the Abbreviated Representations and Certifications (Attachment D), ORNL Terms and Conditions (Attachment A), Prime Contract Flowdowns (Attachment B), and the Bill of Materials (Attachment C).

Key Attachments & Compliance

  • Attachment A (Terms & Conditions): Outlines general purchase order terms, including dispute resolution, warranty, shipping requirements (U.S. citizens for onsite delivery), electrical equipment standards (NRTL listed), IT security (NIST), and PII protection.
  • Attachment B (Prime Flowdown Clauses): Details mandatory FAR, DEAR, and DOE clauses incorporated by reference from the prime contract.
  • Attachment C (Bill of Materials): A critical document listing all required components by part number and manufacturer. Bidders are expected to provide pricing, lead time, and country of origin for these items.
  • Attachment D (Reps and Certs): A mandatory form for offerors to complete, covering business status, export control, Buy American Act, child labor, telecommunications prohibitions (FAR 52.204-25), conflict of interest, and business size certification. Accurate completion is essential for eligibility.
  • Any exceptions taken to the terms and conditions must be clearly explained, as they may impact the responsiveness of the proposal.

Contact Information

People

Points of Contact

Brittanie Mack-BrewsterPRIMARY

Files

Files

Download
Download
Download
Download
Download

Versions

Version 1Viewing
Combined Synopsis/Solicitation
Posted: May 5, 2026
Fabrication Shop-Steam Plant Control Enclosure Items | GovScope