Facilities Maintenance and Repair, Base Maintenance Services for US Army Garrison Rheinland Pfalz, Germany

SOL #: JA_Mini_TMC_Bridge_2026JustificationSole Source

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Army
0409 AQ HQ CONTRACT
APO, AE, 09227, United States

Place of Performance

Place of performance not available

NAICS

Facilities Support Services (561210)

PSC

Repair Or Alteration Of Office Buildings (Z2AA)

Set Aside

No set aside specified

Timeline

1
Posted
Apr 7, 2026

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The U.S. Army 409th Contracting Support Brigade (CSB) has issued a Justification for Other Than Full and Open Competition for a sole-source contract extension for Facilities Maintenance and Repair, Base Maintenance Services at US Army Garrison Rheinland-Pfalz (USAG-RP), Germany. This 7-month extension, valued at $16.4M, is awarded to the incumbent contractor, Elektro-Krück-GmbH, to ensure continuity of critical services while a bid protest is resolved.

Purpose of Extension

This bridge contract extension is necessary to prevent a gap in essential facility maintenance and engineering services for USAG-RP installations, including Germersheim Army Depot (GAD), AAFES Gruenstadt Depot, and Coleman Worksite. A new contract award is currently under protest with the Court of Federal Claims (COFC), halting the transition to a new awardee. The extension ensures life, health, and safety within US Army facilities after April 1, 2026.

Scope of Work

Services include operations, maintenance, and repair of real property, installed building equipment (IBE), and equipment-in-place (EIP). This encompasses preventive maintenance, repair demand maintenance, minor construction, and maintenance of roads, utilities, grounds, environmental protection, pest control, snow/ice removal, and a self-help program. The contract covers USAG-RP installations in Germany.

Contract Details

  • Type: Indefinite-Delivery, Indefinite-Quantity (IDIQ) contract extension (sole-source)
  • Period of Performance: April 1, 2026, to October 31, 2026 (7 months)
  • Estimated Value: $16.4M
  • Contract Structure: Firm Fixed-Price (FFP) for approximately 93% of the workload and Cost Reimbursable for the remaining 7%.
  • Incumbent Contractor: Elektro-Krück-GmbH

Eligibility / Set-Aside

This is a sole-source justification for an extension to the incumbent contractor, Elektro-Krück-GmbH. It is not a solicitation for new proposals or bids. The justification cites 10 U.S.C. 3204(a)(1) and FAR 6.103-1 as the authority for other than full and open competition.

Additional Notes

Extensive market research concluded that the incumbent is the only viable source to prevent a break in critical services, as a 90-day phase-in period would be required for a new contractor, which is not feasible within the current timeline.

People

Points of Contact

Christopher StephensonContract SpecialistPRIMARY
Jessica SpencerContracting OfficerSECONDARY

Files

Files

Download

Versions

Version 1Viewing
Justification
Posted: Apr 7, 2026
Facilities Maintenance and Repair, Base Maintenance Services for US Army Garrison Rheinland Pfalz, Germany | GovScope