FACZG Kitchenette Renovation
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The U.S. Embassy Zagreb, Croatia, has issued a Presolicitation for the renovation of a kitchenette space within the Chancery building, located at U.S. Embassy Compound, Thomasa Jeffersona 2, 10000 Zagreb. This opportunity seeks contractors to supply all labor, supervision, and materials (excluding Government Furnished Materials) to deliver a fully functional, updated kitchenette. Responses are due by May 27, 2026.
Scope of Work
The project involves comprehensive renovation of a second-floor kitchenette. Key tasks include:
- Demolition of existing cabinets, flooring, and baseboards.
- Plumbing work, including installation of new valves and connections for sink and coffee machine, utilizing copper pipes and Viega ProfiPress fittings. No open flame work is permitted without written approval.
- Electrical work, specifically the installation of a new outlet for the coffee machine.
- Drywall repair and painting of walls with specified Dulux QD Eggshell paint (Golden Fern).
- Installation of new SPC Vinyl flooring (Wear Class 34, waterproof) and matching vinyl baseboards.
- Manufacturing and installation of new kitchen cabinets according to provided specifications and approved drawings.
- Installation of new appliances, including a refrigerator, microwave oven, and coffee machine.
Performance Standards & Special Requirements
All work must meet functional standards, with walls uniform and smooth, and flooring waterproof. A final inspection by the Contracting Officer Representative (COR) is required for acceptance. Contractors must obtain written COR approval for any work beyond the stated scope, are responsible for daily trash removal, and are liable for any damages. Accurate measurements must be taken before quoting, as no price adjustments will be made for inaccuracies. A written Accident Prevention Plan is required before work commences. All materials, including cabinetry, countertops, sink, faucet, refrigerator, and flooring, require COR approval prior to installation. Government Furnished Materials include electrical outlets, wire, conduit, and boxes as needed.
Contract & Timeline
- Type: Presolicitation
- Set-Aside: None specified
- Response Due: May 27, 2026, 08:00 AM Z
- Published: April 21, 2026, 01:32 PM Z
- Place of Performance: U.S. Embassy Compound, Thomasa Jeffersona 2, 10000 Zagreb, Croatia.
- Start Date: To be determined by the U.S. Embassy Management Office.
Contact Information
- Primary: Matthew A. Dean (Deanm2@state.gov, 38516612248)
- Secondary: Martina Todoric (TodoricM@state.gov, 385984552339)