Fall Protection System

SOL #: W50S6V26Q0002Combined Synopsis/Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Army
W7MY USPFO ACTIVITY COANG 140
AURORA, CO, 80011-9589, United States

Place of Performance

CO

NAICS

Overhead Traveling Crane (333923)

PSC

Winches, Hoists, Cranes, And Derricks (3950)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Mar 11, 2026
2
Last Updated
Apr 15, 2026
3
Submission Deadline
Apr 27, 2026, 4:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The 140th Logistics Readiness Squadron, Vehicle Management Flight (140 LRS/LGRV) at Buckley Space Force Base, CO, is soliciting proposals for the acquisition and installation of a permanent, overhead Fall Protection System for its Refueling Maintenance (RFM) bay. This is a Total Small Business Set-Aside opportunity, with quotes due by April 27, 2026, at 10:00 AM MDT.

Purpose & Scope

The primary purpose is to provide a safe and compliant working environment for mechanics performing maintenance on R-11 refueler trucks and other high-profile vehicles, addressing a significant fall hazard (work surfaces exceeding 10 feet). The system is required to comply with AFI 91-203 and OSHA regulations. The absence of a compliant system poses an unacceptable risk to personnel and mission execution.

The scope of work includes the acquisition and installation of a permanent rail system, rated for 2 users (400 lbs capacity), featuring an aluminum rail, 2 trollies, and 2 Self-Retracting Lifelines (SRLs) each 20 feet long. Contractor responsibilities encompass all engineering, design, fabrication, materials, labor, equipment rental, travel, shipping, final system certification, Certificate of Compliance, and one on-site training session for government personnel.

Contract Details

  • Contract Type: Firm Fixed Price purchase order, utilizing simplified acquisition procedures.
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5).
  • NAICS Code: 333923 (Overhead Traveling Crane, Hoist, and Monorail System Manufacturing) with a 1,250-employee size standard.
  • Place of Performance: Buckley Space Force Base, CO 80011.
  • Delivery: All items shall be delivered within 30 days of contract award unless otherwise requested.

Submission & Evaluation

  • Solicitation Issue Date: March 20, 2025.
  • Site Visit: A site visit was held on April 14, 2026, at 10:00 AM MDT (RSVP required by April 8, 2026). A Base Access Form (Buckley SFB Form 128) was required for visitors.
  • Questions Due Date: Questions were due by April 15, 2026.
  • Response Deadline: Quotes are due by April 27, 2026, at 10:00 AM MDT.
  • Submission: Quotes must be submitted via email to 140.WG.MSC@us.af.mil. Quotes shall not exceed 10MB, and documents will not be longer than 5 pages per attachment.
  • Evaluation Factors: Technical acceptability (meeting salient characteristics, providing sufficient information like photos/product literature), Past Performance (FAPIIS and SPRS), and Price (best value).
  • Eligibility: All companies must be registered in SAM.gov.

Important Notes

  • Presently, no funds are available for this requirement.
  • The government will not provide contract financing.
  • Recent Q&A indicates that specific railing dimensions, structural plans, and load capacity information are still being clarified, and vendors have raised concerns about the feasibility of the 30-day delivery timeline given industry lead times for engineered systems.

People

Points of Contact

140th Contracting OfficePRIMARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 6
Combined Synopsis/Solicitation
Posted: Apr 15, 2026
View
Version 5Viewing
Combined Synopsis/Solicitation
Posted: Apr 14, 2026
Version 4
Combined Synopsis/Solicitation
Posted: Apr 8, 2026
View
Version 3
Combined Synopsis/Solicitation
Posted: Mar 26, 2026
View
Version 2
Combined Synopsis/Solicitation
Posted: Mar 25, 2026
View
Version 1
Combined Synopsis/Solicitation
Posted: Mar 11, 2026
View