FCC BUTNER PRECAST JOINT REPLACEMENT FMC

SOL #: 15B10626Q00000012Solicitation

Overview

Buyer

Justice
Federal Prison System / Bureau Of Prisons
FMC BUTNER
BUTNER, NC, 27509, United States

Place of Performance

Butner, NC

NAICS

Structural Steel and Precast Concrete Contractors (238120)

PSC

Repair Or Alteration Of Penal Facilities (Z2FF)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Apr 2, 2026
2
Last Updated
May 18, 2026
3
Submission Deadline
May 20, 2026, 6:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Federal Bureau of Prisons (BOP), specifically FMC Butner, has issued a Solicitation (15B10626Q00000012) for a Firm Fixed-Price construction contract for Precast Joint Replacement at the Federal Medical Center (FMC) in Butner, NC. This is a 100% Total Small Business Set-Aside. The project involves furnishing all equipment, materials, and labor for the complete replacement of precast joints. Offers are due May 20, 2026, by 2:00 PM EST.

Scope of Work

The project requires the replacement of exterior precast concrete panel control joints, concrete-to-metal window frame joints, louvers, and designated expansion joints across all elevations of the FMC Butner buildings. This includes cutting out, cleaning, priming, fitting with backer rod, and caulking joints using polyurethane sealant. Specific quantities include approximately 7,200 linear feet of 1-inch precast wall panel joints, 436 linear feet of 4-inch and 6-inch expansion joints, seals for 18 single doors, 1 double man door, 4 louvers, 8 metal wall panel joints, and 950 windows. Installers must be manufacturer-qualified and certified. Materials must meet current industry standards. A written five-year guarantee covering material and workmanship is required.

Contract & Timeline

  • Contract Type: Firm Fixed-Price construction contract.
  • Performance Period: 140 calendar days from the issuance of the Notice to Proceed.
  • NAICS Code: 238120 (Small Business Size Standard: $19.0 million).
  • Set-Aside: 100% Total Small Business Set-Aside.
  • Published Date: April 17, 2026.
  • Questions Deadline: May 15, 2026, by 3:00 PM EST.
  • Offer Due Date: May 20, 2026, by 2:00 PM EST.
  • Site Visit: Optional, May 5, 2026, at 9:00 AM EST at FMC Butner. NCIC background checks are required for attendees.

Submission & Evaluation

Offers must be emailed to bmckeown@bop.gov and a1huffman@bop.gov. Required submissions include pages 1, 2, and 6 of the solicitation, Standard Form 1442, Commodity or Services Schedule (Page 6), Section 7: Representations and Certifications, Past Performance Questionnaire (sent to references), Bank Reference (sent to bank), and acknowledged amendments. Performance and Payment Bonds are required. Failure to provide all required information may result in non-responsiveness.

Additional Notes

Contractors must be registered in SAM.gov with business size metrics meeting the small business size standard for NAICS 238120. The applicable wage determination is NC20260003 for building construction in Durham County, North Carolina, which specifies prevailing wage rates and fringe benefits. Strict security procedures, including contractor badges, daily checklists, and prohibited items (cell phones, cameras), will be enforced at the facility. Work hours are 7:30 AM – 3:00 PM, Monday - Friday, excluding Federal Holidays.

People

Points of Contact

Broguen McKeownPRIMARY
Ashley HardingSECONDARY

Files

Files

No files attached to this opportunity

Versions

Version 6
Solicitation
Posted: May 18, 2026
View
Version 5
Solicitation
Posted: May 18, 2026
View
Version 4
Solicitation
Posted: May 7, 2026
View
Version 3
Solicitation
Posted: Apr 21, 2026
View
Version 2Viewing
Solicitation
Posted: Apr 17, 2026
Version 1
Pre-Solicitation
Posted: Apr 2, 2026
View