FCC Yazoo City - Air Cooled Condensors Replacement

SOL #: 23Z3AJ2Combined Synopsis/Solicitation

Overview

Buyer

Justice
Federal Prison System / Bureau Of Prisons
FCC YAZOO CITY
YAZOO CITY, MS, 39194, United States

Place of Performance

Yazoo City, MS

NAICS

Plumbing (238220)

PSC

Air Conditioning Equipment (4120)

Set Aside

No set aside specified

Timeline

1
Posted
Jun 9, 2026
2
Submission Deadline
Jun 22, 2026, 5:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of Justice, Bureau of Prisons (BOP), specifically FCC Yazoo City, is seeking proposals for the replacement of an aging geothermal system with new air-cooled condensers at the Federal Prison Camp in Yazoo City, Mississippi. This is a Combined Synopsis/Solicitation for the installation of three air-cooled condenser units to service approximately 15,500 square feet of the Camp Core and Education buildings.

Scope of Work

The primary objective is to replace the existing non-functioning geothermal system. The contractor will be responsible for providing all materials, labor, and services to install three specific or mechanically similar air-cooled condenser units. Key specifications include:

  • Equipment: High-efficiency, sickle-blade AC fan motors (e.g., ZIEHL-ABEGG) operating at 550 RPM, enclosed in 16-gauge galvanized steel casings. Fans must produce a maximum sound pressure level of 46 dBA at 10 meters.
  • Electrical: Systems must run on 460 main power.
  • Coils: High heat transfer Tube & Fin coils, factory leak-tested at 600 psig.
  • Installation Duties: Pouring concrete equipment pads, core drilling walls, connecting and insulating refrigeration/electrical lines, evacuating and charging units, and providing factory startup/commissioning. The original geothermal system will be capped and abandoned in place.

Performance Standards & Operational Constraints

  • Sound Level: Fans must not exceed 46 dBA at 10m.
  • Compliance: All work must adhere to local, state, national codes, OSHA regulations, and environmental best practices.
  • Work Hours: Monday through Friday, 7:30 am to 3:30 pm, excluding federal holidays.
  • Project Timeline: The entire project must be completed within 150 calendar days.
  • Security: Contractor personnel will be escorted at all times. Prohibited attire includes khaki, olive-green, camouflage, and sleeveless clothing. Electronic devices, tobacco/vapor products, weapons, and unapproved medications are strictly forbidden on site. No interaction with inmates is permitted.

Contract & Timeline

  • Type: Combined Synopsis/Solicitation
  • Set-Aside: None specified.
  • Response Due: June 22, 2026, 12:00 PM CDT (17:00 PM UTC).
  • Published: June 9, 2026.

Site Visit & Contact Information

A site visit will be held on June 16, 2026, at 10:00 AM CST. Interested parties must contact B. Wiles at bhwiles@bop.gov no later than June 12, 2026, 12:00 PM CST to express interest. The primary point of contact for this opportunity is Carlos Tate at c3tate@bop.gov or 662-716-1020.

People

Points of Contact

Carlos TatePRIMARY

Files

Files

Download

Versions

Version 1Viewing
Combined Synopsis/Solicitation
Posted: Jun 9, 2026
FCC Yazoo City - Air Cooled Condensors Replacement | GovScope