FCI Englewood - Replace Powerhouse Roof

SOL #: 15BBNF26Q00000038Combined Synopsis/Solicitation

Overview

Buyer

Justice
Federal Prison System / Bureau Of Prisons
FAO
GRAND PRAIRIE, TX, 75051, United States

Place of Performance

Littleton, CO

NAICS

Roofing Contractors (238160)

PSC

Repair Or Alteration Of Penal Facilities (Z2FF)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Mar 16, 2026
2
Last Updated
Apr 28, 2026
3
Submission Deadline
May 8, 2026, 6:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Federal Bureau of Prisons, Field Acquisition Office (FAO), is soliciting proposals for the complete removal and replacement of the Powerhouse Roof at FCI Englewood in Littleton, CO. This is a Firm Fixed-Price contract set aside for Total Small Business concerns. The project is estimated to be between $100,000.00 and $250,000.00. Proposals are due May 8, 2026, at 12:00 PM MT.

Scope of Work

The contractor will furnish all labor, materials, equipment, tools, supervision, and warranties to remove approximately 12,000 square feet of existing roofing and install a new fully adhered TPO roofing system. This includes approximately 11,500 square feet over metal decking and 500 square feet over concrete decking. The work encompasses all associated roofing components such as insulation, flashings, copings, drainage, gutters, downspouts, sealants, primers, adhesives, substrate materials, penetration seals, fasteners, fiberboard, gypsum board, termination bars, sheet metal, vapor protection, and walkway protection. The new system must meet a 20-year warranty and a 100-mph wind rating, confirmed by a manufacturer's assembly letter. All work must comply with manufacturer's specifications, applicable codes, and project specifications (Divisions 01, 02, and 07).

Contract Details

  • Type: Firm Fixed-Price
  • Magnitude: Estimated between $100,000.00 and $250,000.00
  • Performance Period: 10 calendar days to begin after award, 102 calendar days to complete.
  • Set-Aside: Total Small Business (NAICS 238160 Roofing Contractors)
  • Key Clauses: Includes FAR Clause 52.222-90 (DEI Discrimination), tailored FAR Clause 52.212-4 (Commercial Products and Services), and FAO-0023 (Payments Under Fixed-Price Construction Contracts).
  • Wage Determination: General Decision Number C020260023 for Building Construction Projects in Jefferson County, CO applies.

Submission & Evaluation

Award will be made to the responsible vendor whose quotation is determined to be Lowest Price Technically Acceptable (LPTA). Technical acceptability and price will be evaluated in accordance with the solicitation. Offerors must include a specification sheet and any submittal information about the products offered. A bid bond (SF24) is required, with a penal sum of at least 20% of the bid price, not to exceed $3 million. Offerors must be registered in SAM.gov and complete necessary representations and certifications. Faxed and hand-delivered quotes will not be accepted.

Key Dates & Contact

  • Proposal Due Date: May 8, 2026, at 12:00 PM MT
  • Site Visit: A pre-quotation site visit was held on March 25, 2026. Minutes and photos from this visit have been incorporated via Amendment 0001.
  • Questions: Vendor questions were due by March 27, 2026, and consolidated responses, along with a revised Statement of Work, have been issued via Amendment 0003.
  • Contact: Luke Bonner, lbonner@bop.gov

People

Points of Contact

Luke BonnerPRIMARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 6Viewing
Combined Synopsis/Solicitation
Posted: Apr 28, 2026
Version 5
Combined Synopsis/Solicitation
Posted: Apr 20, 2026
View
Version 4
Combined Synopsis/Solicitation
Posted: Apr 8, 2026
View
Version 3
Combined Synopsis/Solicitation
Posted: Mar 27, 2026
View
Version 2
Combined Synopsis/Solicitation
Posted: Mar 18, 2026
View
Version 1
Combined Synopsis/Solicitation
Posted: Mar 16, 2026
View