FCI La Tuna- Emergency Repair Power Plant

SOL #: 15BBNF26P00000022JustificationSole Source

Overview

Buyer

Justice
Federal Prison System / Bureau Of Prisons
FAO
GRAND PRAIRIE, TX, 75051, United States

Place of Performance

Anthony, TX

NAICS

Plumbing (238220)

PSC

Repair Or Alteration Of Penal Facilities (Z2FF)

Set Aside

No set aside specified

Timeline

1
Posted
Mar 19, 2026

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Federal Prison System / Bureau of Prisons has issued a Justification for Restricting Competition for the urgent repair of Main Power Plant boilers at FCI La Tuna, Anthony, TX. This requirement, estimated at $82,790.00, addresses severe leaks in two of three critical boilers, posing an urgent operational risk.

Scope of Work

This justification covers the urgent repair of two of three Main Power Plant boilers that have developed severe leaks. The work requires certified technicians to restore the boilers to operational status, ensuring the facility's steam heat supply.

Contract & Timeline

  • Type: Justification for Restricting Competition (IAW FAR 12.102 (a))
  • Value: $82,790.00
  • Set-Aside: Not applicable (Justification for Sole Source)
  • Published: March 19, 2026

Justification

The agency is restricting competition to Wyler Industrial Works due to the urgent nature of the repairs and the vendor's unique qualifications. FCI La Tuna relies on the Power Plant for steam heat, and with two boilers non-operational, there is a significant operational risk. Local vendors were contacted, and only Wyler Industrial Works was identified as possessing the necessary specialized technical expertise and immediate availability to perform these critical repairs within the required timeframe. Failure to complete these repairs promptly could lead to significant operational disruption and increased costs for the government.

Contact Information

For inquiries, contact LaTasha Windham at lwindham@bop.gov.

People

Points of Contact

LaTasha WindhamPRIMARY

Files

Files

Download

Versions

Version 1Viewing
Justification
Posted: Mar 19, 2026
FCI La Tuna- Emergency Repair Power Plant | GovScope