FCI Marion - Replace Summer Boiler #2

SOL #: 15BBNF26Q00000093Combined Synopsis/Solicitation

Overview

Buyer

Justice
Federal Prison System / Bureau Of Prisons
FAO
GRAND PRAIRIE, TX, 75051, United States

Place of Performance

Marion, IL

NAICS

Plumbing (238220)

PSC

Repair Or Alteration Of Penal Facilities (Z2FF)

Set Aside

No set aside specified

Timeline

1
Posted
May 28, 2026
2
Submission Deadline
Jun 29, 2026, 4:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Federal Bureau of Prisons (BOP), Field Acquisition Office, is seeking quotations for the replacement of Summer Boiler #2 at FCI Marion, Illinois. This Total Small Business Set-Aside opportunity requires a contractor to remove an existing 4,800 MBTU boiler and install a new 7,500 MBTU watertube boiler system. The project is estimated between $200,000 and $300,000, with a performance period of 235 calendar days. Quotations are due June 29, 2026, at 11:00 am CDT.

Scope of Work

The contractor will provide all necessary equipment, labor, materials, and incidentals for the complete removal and disposal of the existing boiler, including associated piping and electrical connections. The work involves supplying, delivering, and installing a new Cleaver Brooks M5-700-7500-150St (or equivalent) natural-gas-fired watertube boiler with 7,500 MBTU input / 6,000 MBTU output capacity. Installation includes all required piping, valves, gauges, regulators, safety devices, stack components, gas train modifications, feedwater connections, and electrical reconnections. The project also requires installing new steam spool pieces, a non-return valve, a 4" stop valve, and tying into the existing steam distribution system. Commissioning, boil-out procedures, operational testing, and verification of safety and control functions are mandatory. All work must comply with Federal, State, and local codes, including IBC, IMC, NEC, NFPA, OSHA, ACA Standards, and BOP Technical Design Guidelines. Upon completion, the contractor must provide service manuals, troubleshooting manuals, and operator training.

Contract Details

  • Solicitation Number: 15BBNF26Q00000093
  • Type: Combined Synopsis/Solicitation (RFQ), Firm Fixed Price
  • NAICS: 238220 Plumbing, Heating, and Air Conditioning Contractors
  • Set-Aside: Total Small Business Set-Aside
  • Magnitude: $200,000.00 to $300,000.00
  • Performance Period: 235 Calendar Days from Notice to Proceed
  • Place of Performance: FCI Marion, Marion, IL 62959

Submission & Evaluation

Offerors must submit quotations electronically to lbonner@bop.gov, ensuring the subject line includes the solicitation number. Required submissions include SF 1442, Schedule of Supplies/Services, Representations and Certifications (FAO-0021), and a specification sheet for offered products. A Bid Bond (SF24) is mandatory, equal to 20% of the bid price or $3,000,000, whichever is less. Performance and Payment Bonds are required within 10 days of award. Evaluation will consider Price, Past Performance, and Technical Capability.

Key Dates & Requirements

  • NCIC Forms Due (for site visit): June 10, 2026, by 9 am CDT (email to mmcnealy@bop.gov)
  • Site Visit (encouraged): June 17, 2026, at 9:30 am CDT at FCI Marion. Pre-approval via NCIC check is required.
  • Questions Due: June 22, 2026, by 11 am CDT (email to lbonner@bop.gov)
  • Quotation Deadline: June 29, 2026, at 11:00 am CDT
  • Registration: Contractors must be registered in SAM.gov with correct NAICS and size metrics.
  • Security: Extensive security clearance requirements, including background investigations, apply to contractor personnel.
  • Wage Rates: Prevailing wage rates and fringe benefits from General Decision IL20260002 apply.

People

Points of Contact

Luke BonnerPRIMARY

Files

Files

Download
Download
Download
Download
Download
Download

Versions

Version 1Viewing
Combined Synopsis/Solicitation
Posted: May 28, 2026
FCI Marion - Replace Summer Boiler #2 | GovScope