Fermilab-ICB-A Angstrom E-Beam ECR Vacuum Electrical Feed-DG
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of Energy (DOE), through FERMILAB - DOE CONTRACTOR, is soliciting proposals for the Fermilab-ICB-A Angstrom E-Beam ECR Vacuum Electrical Feed-DG project. This is a Total Small Business Set-Aside for a firm fixed-price subcontract to install electrical infrastructure. Proposals are due June 12, 2026, at 3:00 PM CT.
Purpose & Scope of Work
The subcontractor will install new electrical feeders, conduit systems, junction boxes, safety switches, and associated wiring for the Angstrom E-Beam ECR Vacuum Deposition System (100A feed) and the Haskris Chiller (60A feed) at the ICB-A Industrial Complex, Fermilab, Batavia, Illinois. This includes panel modifications, new breaker installations, scheduled power outages, terminations, labeling, and cleanup. All work must comply with applicable codes (OSHA, NFPA 70/70E, NEC, Fermilab ES&H Manual) and Fermilab's Health and Safety Plan (HASP). The period of performance is from January 2026 to December 2027.
Contract Details
- Contract Type: Firm Fixed-Price Subcontract (Solicitation)
- Set-Aside: Total Small Business Set-Aside (FAR 19.5)
- NAICS Code: 238210 – Electrical Contractors and Other Wiring Installation Contractors (Size Standard: $19.0 million)
- Place of Performance: ICB-A Industrial Complex, Fermilab, Batavia, Illinois
- Period of Performance: January 2026 to December 2027
Key Requirements & Deliverables
The scope includes all transportation, overhead, bonding, insurance, safety, quality control, and supervision. Subcontractors must adhere to comprehensive general requirements (Exhibit C), ES&H requirements (Exhibit D), and quality requirements (Exhibit F), including submitting a Corporate Quality Assurance Plan or using the provided template. Required documentation includes progress meeting minutes, quality control documentation, as-built records, and final acceptance documentation. A Payment Bond (Exhibit O) and Insurance (Exhibit H) are mandatory for the successful offeror. Certified payroll and labor compliance documentation are required weekly via LCPTracker, adhering to Davis-Bacon Act wage rates (Exhibit P). The Buy American Act applies to construction materials.
Submission & Evaluation
Proposals will be evaluated using a Lowest Price Technically Acceptable (LPTA) approach. Technical proposals are assessed on an acceptable/unacceptable basis, focusing on:
- Corporate Capabilities: Minimum 5 years electrical experience in industrial facilities.
- Current/Past Experience: Minimum 3 projects in the last 10 years.
- Key Personnel Experience: Project Manager and Superintendent.
- Safety Documentation: Including a Subcontractor Safety Information Questionnaire (Exhibit J).
- Quality Documents. A Price Proposal Form (Exhibit K) is required. Offerors must also submit various certifications and representations (Exhibits L, M) and a Bid Bond (Exhibit N) of not less than 20% (not to exceed $3 million).
Important Dates & Contact
- Pre-Proposal Meeting & Site Visit: May 14, 2026, at 10:00 AM CDT (strongly recommended).
- Questions Due: May 18, 2026.
- Proposal Due Date: June 12, 2026, at 3:00 PM CT.
- Contact: Dasia Guthrie (dguthrie@fnal.gov, 630-840-2494).