FIRE PUMP ASSEMBLY

SOL #: 70Z08026QAG120Combined Synopsis/Solicitation

Overview

Buyer

Homeland Security
Us Coast Guard
SFLC PROCUREMENT BRANCH 1(00080)
NORFOLK, VA, 23510, United States

Place of Performance

Place of performance not available

NAICS

Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance (811310)

PSC

Power And Hand Pumps (4320)

Set Aside

No set aside specified

Timeline

1
Posted
May 19, 2026
2
Submission Deadline
May 22, 2026, 7:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The U.S. Coast Guard (USCG) is soliciting quotes for the inspection, repair, and overhaul of three (3) Fire Pump Assemblies (NSN: 4320-01-481-4914, P/N: 3186-9534-USCG) for its 270' Medium Endurance Product Line vessels. This is a Total Small Business Set-Aside opportunity. Quotes are due by May 22, 2026, at 3 PM EDT.

Scope of Work

The contractor will perform preliminary disassembly, inspection, and overhaul services for the specified centrifugal pump units. Key requirements include:

  • Mandatory Replacement: All replacement parts must be new, with specific components like software, bearings, shaft seals, and threaded fasteners requiring mandatory replacement.
  • Modifications: Conversion of packing glands to a mechanical seal assembly (Chesterton P/N 442-17 SPK 678344) and installation of an abrasive separator (John Crane P/N 8109513) if missing.
  • Drive Motor: Exchange if overhaul cost exceeds 70% of a new motor's replacement cost; otherwise, recondition to like-new condition.
  • Testing: Comprehensive rotational, hydrostatic (150% of max working pressure), and performance tests (meeting or exceeding manufacturer's flow curve within 5% tolerance) are required.
  • Painting: Removal of existing paint and application of new primer and finish coats per MIL-SPEC and AMS standards.
  • Proprietary Data: The USCG does not own rights to proprietary data and cannot provide drawings or schematics. Substitute parts are not acceptable.

Contract & Timeline

  • Type: Combined Synopsis/Solicitation (RFQ) for commercial items, anticipating a competitive price purchase order.
  • Set-Aside: Total Small Business Set-Aside (FAR 52.219-6).
  • NAICS: 811310 (Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance).
  • Quantity: 3 Each.
  • Delivery: Required by November 11, 2026, to USCG SFLC, 2401 Hawkins Point Road, Baltimore, MD 21226.
  • Quote Due: May 22, 2026, 3 PM Eastern Daylight Savings Time (DST).
  • Questions Due: May 20, 2026.
  • Published: May 19, 2026.

Evaluation & Submission

Award will be made to the lowest-priced, technically acceptable offeror. Quotes must be all-or-nothing for the entire requirement. Offerors must be registered in SAM.gov prior to submittal and will undergo FAPIIS review. Quotes must include a total firm fixed price with inspection fees for equipment and shipping. Electronic payment will be processed via the Invoice Processing Platform (IPP).

Special Requirements

  • Packaging & Marking: Items must be individually packaged per ASTM D-3951 and marked with specific NSN, item name, part number, and government order details.
  • Warranty: A standard manufacturer's warranty or a contractor guarantee for up to two years after delivery is required.
  • Cost Estimate: The estimated overhaul cost per unit is not to exceed $49,907.88.

Contact Information

All questions and quotes should be emailed to Nina Crosby at Nina.m.crosby@uscg.mil.

People

Points of Contact

Files

Files

Download
Download

Versions

Version 1Viewing
Combined Synopsis/Solicitation
Posted: May 19, 2026
FIRE PUMP ASSEMBLY | GovScope