Fire Sprinkler System Inspection and Repair Services at PEWARS
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
The requirement consists of inspection and repair services for existing wet-pipe fire sprinkler systems located in Buildings N-104 and T-1002. Required tasks include National Fire Protection Association (NFPA) Standard 25 five-year internal obstruction investigations, sprinkler head surveys, removal and submission of sprinkler heads for Underwriters Laboratories (UL) testing, and the repair or replacement of valves, gauges, pipe sections, hangers, water motor alarms, and related fire protection system components. All work must comply with NFPA 25 (Inspection, Testing, and Maintenance of Water-Based Fire Protection Systems), NFPA 13 (Installation of Sprinkler Systems), NFPA 72 (National Fire Alarm and Signaling Code), NFPA 101 (Life Safety Code), applicable International Code Council (ICC) building codes, and Occupational Safety and Health Administration (OSHA) regulations. The complete description of required tasks is contained in the Government?s Performance Work Statement (PWS).The applicable North American Industry Classification System (NAICS) code is 561210 ? Facilities Support Services, with the corresponding Product Service Code (PSC) H312 ? Inspection and Repair of Fire Control Equipment.