Fire Suppression System Inspection, Testing, and Inventory
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
The purpose of this amendment is to add attachment 5, UFC Fire Protection ITAM. END AMENDMENT 3. The purpose of this amendment is to clarify the work requirements for wet and dry chemical systems. The sentence These shall be tested, inspected, and maintained twice throughout the 12 month period of performance. is added to PWS paragraphs 5.7.1 and 5.8.1. END AMENDMENT 2. The purpose of this amendment is to extend the quote due date to 08 August 2025, extend the period of performance for CLIN 0002, inventory of fire suppression systems, to 12 months and update the wage determination to 2015-5775 rev 28. END AMENDMENT 1. Fort Drum, NY has a requirement for fire suppression system inspection, testing, and inventory. See document CSS_W911S225QA032 for Attachments 1, 2, 3, and 4, and all applicable FAR and DFARS clauses and provisions. Quote Submission: All quotes shall be submitted electronically via the PIEE Solicitation Module. Quoters shall nominate a Proposal Manager in the PIEE Solicitation Module. The Proposal Manager shall respond and post quotes to this solicitation in the PIEE Solicitation Module. For information and training on how to add the role to the quoter?s profile, the functions of the Proposal Manager, and how to post an offer/bid/quote, go to https://piee.eb.mil/. Log on to PIEE; select Help; select New User Information and Help; select Web Base Training.