Flooring Replacement at Safety Office - Neville Island

SOL #: W911WN25QA027Combined Synopsis/Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Army
W072 ENDIST PITTSBURGH
PITTSBURGH, PA, 15222-4198, United States

Place of Performance

Place of performance not available

NAICS

Flooring Contractors (238330)

PSC

Maintenance Of Office Buildings (Z1AA)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Jun 26, 2025
2
Last Updated
Jun 30, 2025
3
Submission Deadline
Jul 3, 2025, 4:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

The requirement is to remove existing flooring, evaluate and address the subfloor condition (clean or remove tile as necessary), and apply a Super Poly epoxy coating in accordance with the provided specifications.The contractor shall furnish all necessary labor, materials, equipment, and supervision to perform the refinishing services at the Safety Office located on Neville Island.

People

Points of Contact

Files

Files

View
View
View
View

Versions

Version 2Viewing
Combined Synopsis/Solicitation
Posted: Jun 30, 2025
Version 1
Combined Synopsis/Solicitation
Posted: Jun 26, 2025
View
Flooring Replacement at Safety Office - Neville Island | GovScope