Flooring Replacement for USCG Station Grand Isle, LA
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The U.S. Coast Guard (USCG) is soliciting quotes for a firm-fixed-price contract to replace flooring at USCG Station Grand Isle, LA. This project involves the removal of damaged flooring and the installation of new, waterproof systems across approximately 1,100 square feet of facility space. Quotes are due by February 26, 2026.
Scope of Work
The contractor shall provide all labor, tools, and materials to:
- Remove existing damaged flooring and prepare concrete surfaces to ensure a level finish.
- Install 100% waterproof engineered hardwood in the Crew Lounge ("Trail Oak"), Conference Room, CO Office, and XPO Office ("Med Gray Oak").
- Install new white vinyl wall cove base in all rooms.
- Option Item: Prep and paint five metal entry doors at the base of the building.
- Complete all work within 60 days of contract award during normal operating hours (0800-1600).
Contract & Timeline
- Type: Firm-Fixed-Price Purchase Order (RFQ)
- Set-Aside: Total Small Business Set-Aside
- Response Due: February 26, 2026
- Location: Grand Isle, LA
- Site Visit: Highly recommended to take field measurements; contact MKC Shawn T. Bissinger at Shawn.T.Bissinger@uscg.mil to arrange access.
Evaluation
Award will be made to the Lowest Priced Technically Acceptable (LPTA) offer. Evaluation factors include:
- Price
- Technical Acceptability
- Past Performance
Additional Notes
Offerors must be actively registered in SAM.gov. Payment and performance bonds are not required for this project. Construction wage rates for Jefferson Parish, LA, are applicable to this requirement.