Folsom Pumping Plant (FOU) Motor Repair - CCAO
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Bureau of Reclamation (BUREAU OF RECLAMATION) is soliciting quotes for the repair and commissioning of Motor 2 at the Folsom Pumping Plant (FOU). This requirement is a Total Small Business Set-Aside and is critical for maintaining continuous water delivery. Quotes are due March 13, 2026, at 10:00 AM Pacific Standard Time (PST).
Scope of Work
This opportunity involves the comprehensive repair of a damaged commutator on Motor Number #2. Key tasks include:
- Motor Repair: Disconnecting, transporting, and repairing the motor, specifically replacing the damaged commutator, reinstalling the armature, and dynamic balancing.
- Testing & Inspection: Conducting extensive testing, including exciter output, brush monitoring, vibration analysis, voltage/amp readings, bearing temperature, insulation resistance (IR), High Potential (Hi-Pot), winding resistance, polarization index (PI), surge, and no-load/full-load testing.
- Delivery & Alignment: Delivering the repaired motor back to the Folsom Pumping Plant and ensuring proper pump motor alignment.
- Reporting: Providing reports summarizing all test results.
- Warranty: A 365-day warranty from installation or 720 run hours, whichever comes first, covering defects.
Contract & Timeline
- Contract Type: Firm Fixed Price (FFP) service contract.
- Period of Performance: Within sixty (60) calendar days from the date of contract award.
- Set-Aside: Total Small Business Set-Aside (FAR 19.5).
- Quote Due Date: March 13, 2026, 10:00 AM Pacific Standard Time (PST).
- Published Date: February 26, 2026.
Evaluation
Award will be made on a Lowest Price Technically Acceptable (LPTA) basis. Offerors must submit a capability statement demonstrating technical knowledge and experience with similar motor repairs. Vendors must be registered in SAM.gov with current Representations and Certifications.
Additional Notes
- Submission Method: Quotes must be submitted via email to dkullar@usbr.gov in Acrobat (.pdf) format.
- Wage Determination: Bidders must adhere to the