Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The U.S. Forest Service, under the Department of Agriculture, is soliciting quotes for GAOA Laguna Campground Renovations at the Cleveland National Forest in San Diego County, California. This Total Small Business Set-Aside opportunity involves replacing damaged pavement at Laguna Campground and pulverizing and repaving Wooded Hill Road. The acquisition is a Firm Fixed-Price contract with an estimated magnitude between $250,000 and $500,000. Quotes are due by March 3, 2026, at 11:00 AM Pacific Time.
Scope of Work
The project's primary objective is to enhance infrastructure within the Cleveland National Forest. Key tasks include:
- Replacing damaged asphalt pavement at Laguna Campground using HMA Caltrans 1/2 inch max. Type A, PG 64-16 No RAP materials.
- Pulverizing and repaving Wooded Hill Road (15S10) from mile 0.00 to 0.7 miles.
- Installing associated in-kind pavement markings.
- Option 1: Applying a slurry seal over the pavement surface for the Meadow trailer loop and newly repaired sections.
- Incidental work covers subgrade preparation, aggregate base, cleanup, and disposal of construction waste. The contractor must provide all necessary equipment, labor, materials, services, and permits, adhering to specified HMA Caltrans materials and government specifications.
Contract Details
- Contract Type: Firm Fixed Price (FFP)
- Estimated Magnitude: Between $250,000 and $500,000
- Period of Performance: Work must commence within 10 calendar days after the Notice to Proceed (NTP) and be completed within 60 calendar days after NTP, including final cleanup. The projected start date is May or June 2026.
- Set-Aside: Total Small Business Set-Aside (FAR 19.5)
- NAICS Code: 237310 - Highway, Street, and Bridge Construction
- Small Business Size Standard: $45 Million
- Place of Performance: Laguna Campground, 468-470 Los Huecos Rd, Mt Laguna, CA 91948, within the Cleveland National Forest, San Diego County, CA.
Submission & Evaluation
- Quote Submission: Quotes must be emailed to Tanya.Torres@usda.gov by March 3, 2026, at 11:00 AM Pacific Time.
- Requests for Information (RFIs): Questions must be emailed to Tanya.Torres@usda.gov by February 20, 2026, at 11:00 AM Pacific Time.
- Offer Acceptance Period: Offerors must hold prices firm for 75 calendar days from the offer receipt date.
- Evaluation Criteria: Quotes will be evaluated based on Technical Approach, Past Performance, and Price. Award will be made to the highest technically rated offeror whose proposal is fair and reasonable and has acceptable or neutral past performance. Award will not necessarily be made to the lowest-priced offeror.
- Eligibility: Offerors must have an active entity registration at SAM.gov. A Bid Bond/Guarantee is required for proposals exceeding $150,000.
Key Requirements & Conditions
- Site Inspection: An organized site visit will not be hosted; contractors are responsible for inspecting the site. Failure to inspect will not constitute grounds for a claim after award. A site visit prior to bidding is highly recommended.
- Compliance: Adherence to the Davis-Bacon Act prevailing wage rates for San Diego County, CA, is mandatory. The project also requires strict adherence to a Fire Plan for construction and service contracts, including specific tools, equipment, and operational restrictions based on Project Activity Levels (PAL).
- Administrative: All invoices must be submitted through the U.S. Department of Treasury's Invoice Processing Platform (IPP). Only the Contracting Officer (CO) can approve contract changes.
- Submittals: Required submittals include Bid Bond, Performance Bond, Payment Bond, Materials Approval/Slips/Testing, Site Safety Plan, Proposed Project Schedule/Plan/Project Updates Weekly, and Schedule Updates.
- Technical Specifications: Detailed technical specifications are provided for work restrictions, project management, quality requirements, mobilization, cleaning/waste management, demolition, concrete work, site clearing, and site improvements. Drawings provide visual and technical specifications for both Laguna Campground and Wooded Hill Road.