Former Nebraska Ordnance Plant (FNOP) near Mead, NE, SATOC Synopsis
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The U.S. Army Corps of Engineers (USACE) Kansas City District is soliciting qualifications for Architect/Engineer (A/E) services to support Hazardous, Toxic, and Radiological Waste (HTRW) activities at the Former Nebraska Ordnance Plant (FNOP) near Mead, NE. This opportunity is a Total Small Business Set-Aside and will result in a Single Award Task Order Contract (SATOC). Firms must submit their qualifications (SF330s) by May 14, 2026, at 10:00 AM CT.
Scope of Work
The A/E services required encompass a broad range of HTRW activities, including:
- Design Work: Involving groundwater treatment systems, extraction wells, groundwater modeling, pre-design investigation, preparation of contract drawings, technical specifications, design analyses, life cycle cost analyses, and computer-aided cost estimating.
- Construction Phase Services: Including shop drawing review, design during construction, and site visits.
Contract & Timeline
- Type: Single Award Task Order Contract (SATOC) for A/E Services
- Set-Aside: Total Small Business Set-Aside (FAR 19.5)
- Product/Service Code: C219 - Other Architect And Engineering Services
- Qualifications Due: May 14, 2026, 10:00 AM CT
- Published: May 5, 2026
- Agency: Department of the Army, USACE Kansas City District
Submission Requirements
Firms are required to submit their qualifications using SF330s through the related notice. Specific instructions for submission should be followed as outlined in the official notice.
Additional Notes
This announcement serves as a synopsis and does not constitute a commitment on the part of the Government to award a contract or to pay any costs incurred as a result of replying to this notice. It should not be construed as a commitment by the Government for any purpose.