Fort Bragg Trailer Removal

SOL #: PANMCC26P0000038947Combined Synopsis/Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Army
W6QM MICC FDO FT BRAGG
FORT BRAGG, NC, 28310-0000, United States

Place of Performance

Fort Bragg, NC

NAICS

Specialized Freight (except Used Goods) Trucking (484220)

PSC

Relocation Services (V301)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Mar 26, 2026
2
Last Updated
Mar 28, 2026
3
Submission Deadline
Apr 17, 2026, 9:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Mission and Installation Contracting Command – Fort Bragg (MICC-FB), on behalf of the 18th Airborne Corps, is soliciting quotes for non-personal services to remove four modular office trailers (eight trailer beds) from the G2 Foundry Lot at Fort Bragg, NC, to an off-post location. This is a 100% Total Small Business Set-Aside. Quotes are due by April 17, 2026.

Scope of Work

The contractor will be responsible for the complete and safe removal of four double-wide modular office trailers (eight sections) from the G2 Foundry Lot. This includes separating trailer sections, preparing them for safe road transport, loading, and transporting all sections off Fort Bragg. The contractor assumes full ownership, title, and liability for the trailers immediately upon their exit from the installation boundary. No government-specified delivery location is provided; the contractor is responsible for transport to a lawful off-post location of their choosing and for all necessary transportation permits.

Site restoration is required, including cleaning the G2 Foundry Lot of debris, trash, and blocking, returning it to its original or better condition. The contractor must provide all necessary personnel, equipment, supplies, transportation, and supervision. Government assistance (e.g., cranes, forklifts, escorts) will not be provided, though on-post movements must be coordinated through the COR. Trailers are approximately 24 ft (W) x 60 ft (L) each, with axles and tires of unknown condition; hitches need re-attachment.

Contract Details

  • Contract Type: Firm Fixed Price (FFP)
  • Period of Performance: April 27, 2026 – May 8, 2026
  • Place of Performance: G2 Foundry Lot, Fort Bragg, NC
  • Set-Aside: 100% Total Small Business Set-Aside
  • NAICS Code: 484220 (Specialized Freight Trucking, Local) with a $34 million size standard

Submission & Evaluation

  • Quotes Due: April 17, 2026, 5:00 PM EDT
  • Questions Due: April 6, 2026, 12:00 PM EST
  • Site Visit: April 1, 2026, 10:00 AM at BLDG 2-1731 Stiner Street, Fort Bragg, NC. Attendance is not mandatory.
  • Submission Method: Email quotes to mitchell.h.collazo.mil@army.mil and francisco.j.nodamerly.mil@army.mil. No telephonic quotes.
  • Quote Validity: Quotes must be valid for ninety (90) calendar days.
  • Evaluation: Award will be made to the responsible offeror whose quote represents the lowest price and conforms to the solicitation.
  • Eligibility: Offerors must have a UEI and be actively registered in SAM.gov.

Special Requirements

Contractor personnel must comply with installation access control, security policies, OPSEC, and required training (AT Level I, OPSEC Level I, iWATCH, Cyber Awareness). Safety compliance includes FAR 52.236-13, EM 385-1-1, an Accident Prevention Plan, and Activity Hazard Analyses (AHAs). Environmental compliance with Federal, State, and local laws is mandatory, including proper waste handling and spill prevention; government dumpsters are prohibited. Post-award submittals include transportation and safety plans.

People

Points of Contact

Mitchell H. CollazoPRIMARY
Francisco J. Noda MerlySECONDARY

Files

Files

Download
Download
Download
Download
Download

Versions

Version 2Viewing
Combined Synopsis/Solicitation
Posted: Mar 28, 2026
Version 1
Combined Synopsis/Solicitation
Posted: Mar 26, 2026
View