Fort Buchanan Microgrid

SOL #: W912QR-26-R-A028Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Army
W072 ENDIST LOUISVILLE
LOUISVILLE, KY, 40202-2230, United States

Place of Performance

San Juan, PR

NAICS

Power and Communication Line and Related Structures Construction (237130)

PSC

Construction Of Other Utilities (Y1NZ)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Mar 5, 2026
2
Last Updated
Apr 29, 2026
3
Submission Deadline
May 20, 2026, 2:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The U.S. Army Corps of Engineers (USACE) Louisville District is soliciting proposals for a Design-Bid-Build Construction project to install an installation-level microgrid at Fort Buchanan, San Juan, Puerto Rico. This Total Small Business Set-Aside aims to enhance energy resiliency through on-site generation. The contract is a Firm-Fixed-Price (FFP) with a target ceiling of $45,000,000. Proposals are due May 20, 2026, at 10:00 AM Eastern Time.

Scope of Work

The project involves the Design-Bid-Build construction of a microgrid system, including:

  • Approximately 8 MW of new diesel generators and a 4 MWh Battery Energy Storage System (BESS) (as an option).
  • A microgrid control system with paralleling switchgear, transformers, transfer switches, circuit breakers, protective relaying, and fiber optic communication connections.
  • Twelve 12,000-gallon above-ground, ballistic-resistant diesel fuel tanks with a fuel polishing system to sustain critical operations for 14 days.
  • Integration of existing large-scale onsite generation (4.65 MW solar PV array and two 275 kW wind turbines).
  • Site work, start-up commissioning, interconnection agreement, assessment & authorization, and modifications to the existing electrical distribution system.
  • Net metering and interconnection agreements requiring approval from the utility provider, LUMA.

Contract Details

  • Contract Type: Firm-Fixed-Price (FFP) Design-Bid-Build
  • NAICS Code: 237130 (Construction Of Other Utilities)
  • Size Standard: $45,000,000.00
  • Set-Aside: Total Small Business Set-Aside
  • Contract Duration: 1,141 calendar days from Notice to Proceed.
  • Target Ceiling: $45,000,000

Submission & Evaluation

  • Proposals Due: May 20, 2026, 10:00 AM Eastern Time.
  • Submission Method: Electronically via the Procurement Integrated Enterprise Environment (PIEE) Solicitation Module. Hard copies will not be accepted.
  • Evaluation: Best Value Trade-Off process. Evaluation factors, in relative order of importance, are: Past Performance, Technical Approach (Management Plan, Schedule Narrative), and Price. All non-price factors combined are considered approximately equal to price. The Government intends to award without discussions.
  • Required Volumes: Volume I (Past Performance, Technical Approach) and Volume II (Standard Form 1442, Price Breakout Schedule, Joint Venture Agreements, Bonding/Financial Ability, Pre-Award Info, CMMC Level Certification).

Key Requirements & Notes

  • CMMC Level 2 (Self) or higher is mandatory at the time of award, verifiable in the Supplier Performance Risk System (SPRS). Prime contractors and subcontractors must comply.
  • Access to restricted solicitation documents (drawings, specifications) requires CMMC compliance. Interested parties must send a Notification of Interest to the primary contact with company CAGE Code, UEI, and confirmation of CMMC Level 2 assessment in SPRS.
  • Offerors must have and maintain an active registration in the System for Award Management (SAM) database.
  • The contractor is responsible for obtaining all necessary permits and endorsements, including approval from LUMA Energy ServCo, LLC, which may take approximately 12 months.
  • The Buy American Act applies to construction materials.

Contact Information

People

Points of Contact

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 6Viewing
Solicitation
Posted: Apr 29, 2026
Version 5
Solicitation
Posted: Apr 27, 2026
View
Version 4
Solicitation
Posted: Mar 13, 2026
View
Version 3
Solicitation
Posted: Mar 11, 2026
View
Version 2
Solicitation
Posted: Mar 11, 2026
View
Version 1
Solicitation
Posted: Mar 5, 2026
View
Fort Buchanan Microgrid | GovScope