Fort Gibson Replace Spillway Bridge
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Fort Gibson Replace Spillway Bridge - *AM0001, This Amendment pushes the site visit back 1 hour, to 2:00 PM CST on 18 AUG 2025. This Amendment also updates section 01 45 00, please see attachments for full details. *AM0002, This Amendment provides a revised section 00 22 11, revised Drawings/Plans set, and Coring Report. Please see attachments for full details. *AM0003, This Amendment provides a revised section 00 22 11, multiple revised specifications sections and drawings/plans. Please see attachments for full details. *AM0004, This Amendment is to update the Wage Determinations for this requirement. Please see attachments for full details