FORT MYERS BEACH HARBOR, MAINTENANCE DREDGING LEE COUNTY, FLORIDA
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The U.S. Army Corps of Engineers, Jacksonville District, is issuing an informational notice for an upcoming Maintenance Dredging opportunity at Fort Myers Beach Harbor, Lee County, Florida. This opportunity is restricted to specific contractors previously awarded under the Small Business Dredging MATOC (W912EP25R0010). The project involves maintenance dredging of the channel, wideners, and settling basin, with material placement in a nearshore area. An RFP is anticipated around March 2, 2026, with proposals due around April 16, 2026.
Scope of Work
The project entails maintenance dredging of Fort Myers Beach Harbor, including its channel, wideners, and settling basin. Excavated material must be transported to and placed in a designated nearshore placement area. Incidental work includes environmental and water quality monitoring and gopher tortoise relocation.
Contract & Timeline
- Opportunity Type: Informational Notice / Pre-Solicitation (Sources Sought) for a Task Order under an existing MATOC.
- Set-Aside: Total Small Business Set-Aside (restricted to specific MATOC holders).
- NAICS: 237990 (Exception) - Dredging and Surface Cleanup Activities.
- Small Business Size Standard: $37 Million.
- Estimated Magnitude: Between $5,000,000 and $10,000,000.
- Period of Performance: 210 calendar days after Notice to Proceed (NTP), including 60 days to commence work. This includes 140 days for the Base and 70 days for Option A, to be performed concurrently.
- Anticipated RFP Release: On or about March 02, 2026.
- Anticipated Proposal Due Date: On or about April 16, 2026.
- Interest Response Due: February 20, 2026, at 3:00 PM EST (for this informational notice).
Eligibility & Evaluation
This opportunity is only available to the following contractors awarded under Solicitation Number W912EP25R0010: AGM Marine Contractors Inc., AHTNA Marine & Construction Company LLC, Atlantic and Gulf Dredging & Marine LLC, Coastal Dredging Co., Inc., Cottrell Contracting Corporation, Next Generation Logistics LLC., Southern Dredging Co, Inc., Southwind Corporation Corp., and Waterfront Property Servies LLC Gator Services. Proposals will not be considered from any other entity. Award of the task order will be made on the basis of Lowest Price Technical Acceptable (LPTA).
Additional Notes
The Request for Proposal (RFP) will be issued electronically on SAM.gov. Interested parties (from the eligible list) must register as an interested vendor on SAM.gov to receive amendments. Registration in SAM is mandatory for award eligibility. For assistance with SAM, visit FSD.gov or call 866-606-8220. To express interest in this informational notice, respond by the specified date to Guesley Leger (Guesley.Leger@usace.army.mil) and Tim Humphrey (timothy.g.humphrey@usace.army.mil).