Fort Pierce Beach Renourishment, St. Lucie County, FL

SOL #: W912EP25BA017Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Army
W074 ENDIST JACKSNVLLE
JACKSONVILLE, FL, 32207-0019, United States

Place of Performance

Place of performance not available

NAICS

Other Heavy and Civil Engineering Construction (237990)

PSC

Repair Or Alteration Of Dredging Facilities (Z2KF)

Set Aside

No set aside specified

Timeline

1
Posted
Jul 18, 2025
2
Last Updated
Aug 21, 2025
3
Submission Deadline
Aug 19, 2025, 5:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Project work includes construction of a beach berm along approximately 7,000 feet of shoreline immediately south of Fort Pierce Inlet between Florida Department of Environmental Protection (FDEP) Range Monuments R-34 and T-41. Beach compatible sand for the project will be dredged from Capron Shoal, located approximately four miles southeast of the project site in state waters. Due to the extensive hardbottom areas located offshore of the fill area, offshore pipeline access to the beach site is prohibited.Offloading the beach fill will be done inside the South Jetty of Fort Pierce Inlet, as shown on the plans. Astaging area and beach access to the beach placement area are located at the end of Seaway Drive and near the south jetty offloading area. Work also includes but is not limited to environmental species monitoring, sea turtle trawling (hopper dredges only), turbidity monitoring, beach tilling, beach fill quality control, screening, MEC construction support, and vibration control and monitoring. The project work is subdivided into a base and one option as indicated on the drawings.

People

Points of Contact

Files

Files

View
View
View
View

Versions

Version 5
Solicitation
Posted: Aug 21, 2025
View
Version 4
Solicitation
Posted: Aug 12, 2025
View
Version 3
Solicitation
Posted: Aug 5, 2025
View
Version 2Viewing
Solicitation
Posted: Aug 5, 2025
Version 1
Solicitation
Posted: Jul 18, 2025
View