Fort Simcoe Job Corps Center Water System Renovation
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The USDA Forest Service is soliciting quotations for the Fort Simcoe Job Corps Center Water System Renovation project in White Swan, WA. This is a Firm Fixed-Price construction contract set aside for Total Small Business concerns. The project involves comprehensive upgrades to the center's potable water distribution system. Quotations are due April 20, 2026.
Scope of Work
This project entails the renovation of the Fort Simcoe Job Corps Center's water system. Key elements include:
- Replacement of approximately 9,256 linear feet of 6-inch water pipe.
- Installation of new fire hydrants and backflow prevention valves.
- Instrumentation upgrades at existing wells and storage tanks.
- Well, reservoir, and fill station improvements.
- Associated electrical work, including a turn-key SCADA system with programming and training.
- Civil works such as selective demolition, trenching, erosion controls, and pavement/sidewalk restoration.
- Removal and disposal of asbestos cement pipe.
Contract & Timeline
- Opportunity Type: Combined Synopsis/Solicitation (Request for Quotation - RFQ)
- Contract Type: Firm Fixed-Price construction contract
- Set-Aside: Total Small Business Set-Aside (NAICS 237110, $45M size standard)
- Period of Performance: 180-day base period from Notice to Proceed; project completion within 365 days of award.
- Site Visits: A second site visit was scheduled for Thursday, April 9, 2026, at 0900 Pacific Time at 40 Abella Lane, White Swan, WA 98952.
- Questions Due: April 14, 2026, 1200 Eastern Time
- Quotations Due: April 20, 2026, 1700 Eastern Time
- Submission Method: Email to Bradley.Martin2@usda.gov
Evaluation
Award will be made on a Lowest Price Technically Acceptable (LPTA) basis. Evaluation factors, of equal importance, include:
- Technical Approach (Project Schedule)
- Demonstrated Prior Experience
- Price Schedule
Offerors must have an active entity registration in SAM.gov.
Key Documents & Clarifications
Bidders must review:
- Attachment 2 Drawings: Detailed scope, design, and technical requirements.
- Attachment 3 Specifications: Comprehensive technical specifications for all project components.
- Attachment 4 Schedule of Items: For accurate cost estimation and pricing proposals (use PDF version).
- Attachment 5 Davis-Bacon Wage Determinations: For prevailing wage rates in Yakima County, WA.
Important clarifications from Q&A:
- Prices must be held for 180 calendar days.
- No liquidated damages or progress payment schedule.
- SCADA system requires a turn-key solution, including programming and training.
- Historian license is now Factory Talk View with integrated historian (perpetual license, 1-year maintenance).
- New flow meters are required for all three wells.
- Reservoir heights must be field verified by contractors.
Contact Information