Fountain City Service Base (FCSB) 1st Floor Mississippi River Project Office (MRPO) Renovation Design-Build Construction Project
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Army, specifically the W07V ENDIST ST PAUL office, has published an award notice for the Fountain City Service Base (FCSB) 1st Floor Mississippi River Project Office (MRPO) Renovation Design-Build Construction Project in Fountain City, WI. This notice was published on June 8, 2026.
Scope of Work
This project involves the renovation of the 1st Floor Mississippi River Project Office at the Fountain City Service Base, utilizing a design-build construction approach.
Contract & Timeline
- Product/Service Code: Z2AA (Repair Or Alteration Of Office Buildings)
- Award Date: June 8, 2026
Contact Information
For further details, the primary contact is Scott E. Hendrix at Scott.E.Hendrix@usace.army.mil. A secondary contact is Kenneth Eshom at kenneth.j.eshom@usace.army.mil.