FT. Detrick Sewage Sludge Transport and Composting

SOL #: W91QV126RA030Combined Synopsis/Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Army
W6QM MICC-FT BELVOIR
FORT BELVOIR, VA, 22060-5116, United States

Place of Performance

Frederick, MD

NAICS

Other Waste Collection (562119)

PSC

Operation Of Sewage And Waste Facilities (M1ND)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Mar 10, 2026
2
Last Updated
Apr 13, 2026
3
Submission Deadline
Apr 15, 2026, 4:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Army is soliciting proposals for Sewage Sludge Transport and Composting Services at the Fort Detrick Wastewater Treatment Plant (WWTP) in Frederick, MD. This is a recompete of an existing contract, set aside for Total Small Business. Proposals are due April 15, 2026, at 12:00 PM ET.

Opportunity Details

Fort Detrick's WWTP requires storage, transportation, and composting of sewage sludge, which has increased due to upgraded treatment processes. The objective is to ensure proper disposal and beneficial use of the accumulated sludge. This is a recompete of contract W91QV121C0002.

Scope of Work

The contractor will be responsible for:

  • Providing containers for sludge storage at the WWTP.
  • Transporting dewatered sewage sludge (at least 15% solids) from Fort Detrick to an approved composting facility.
  • Composting all accumulated sewage sludge for beneficial use (e.g., land application, soil amendments).
  • Obtaining all necessary permits, including MDE utilization and discharge permits for Maryland.
  • Coordinating timely pickups (within 2 days of COR notification).
  • Providing monthly reports on composted sludge volume.
  • Adhering to a Safety and Health Plan and complying with all Federal, State, and local regulations, including Green Procurement and Biobased Procurement requirements.
  • Technicians/transport drivers must have at least one year of experience.

Contract & Timeline

  • Contract Type: Firm Fixed Price
  • Period of Performance: One base year (April 29, 2026 - April 28, 2027) and four 12-month option years, with an optional 6-month extension, extending through April 28, 2030.
  • Set-Aside: Total Small Business
  • NAICS Code: 562119 (Other Waste Treatment and Disposal) with a $47M size standard.
  • Solicitation Issue Date: March 20, 2026
  • Site Visit: April 2, 2026, at 10:00 AM (coordinate by April 1, 2026, 2:00 PM)
  • Questions Due: April 7, 2026, at 12:00 PM ET
  • Offer Due Date: April 15, 2026, at 12:00 PM ET

Submission & Evaluation

  • Submission Method: Quotations must be submitted via email to the Contract Specialist and Contracting Officer. Email size limit is 20MB; multiple emails are permitted.
  • Required Volumes: Volume I (Pricing), Volume II (Technical Capabilities), and Volume III (Pricing Breakout).
  • Evaluation Basis: Lowest Price Technically Acceptable (LPTA), considering technical acceptability and price reasonableness.
  • Important Considerations: Fort Detrick will provide sludge analysis, including PFAS results which are pending and expected about a week after April 8th. This may impact pricing and proposal preparation. The sludge is neither Class A nor Class B. Offerors must be registered in SAM and comply with the Service Contract Act Wage Determination.

People

Points of Contact

Files

Files

Download
Download
Download
Download
Download

Versions

Version 5
Combined Synopsis/Solicitation
Posted: Apr 13, 2026
View
Version 4Viewing
Combined Synopsis/Solicitation
Posted: Apr 9, 2026
Version 3
Combined Synopsis/Solicitation
Posted: Apr 3, 2026
View
Version 2
Combined Synopsis/Solicitation
Posted: Mar 24, 2026
View
Version 1
Combined Synopsis/Solicitation
Posted: Mar 10, 2026
View