FTG247 Replace UPS at IDT1
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
THE PURPOSE OF THIS PROJECT IS TO REPLACE THE EXISTING 80KVA UNINTERRUPTABLE POWER SYSTEMS (UPSS) WITH DISTRIBUTED REDUNDANT 75 KILOVOLT-AMPERE (KVA) UPSS. NEW UPS PANELBOARDS WILL BE ADDED TO ALLOW FOR REDUNDANT RECEPTACLES FOR ALL THE MISSION EQUIPMENT WITHIN THE HIGH-ALTITUDE ELECTROMAGNETIC PULSE (HEMP)-SHIELDED EQUIPMENT ROOM. EMERGENCY POWER OFF (EPO) WILL BE UPGRADED TO THE LATEST MDA GMD STANDARDS. POWER CONTROL AND MONITORING SYSTEM (PCMS) AND POWER QUALITY MONITORING SYSTEM (PQMS) WILL ALSO BE EXTENDED INTO IDT1 FROM THE FORT GREELY POWER PLANT (FPP).TO RECEIVE A COPY OF THE SOLICITATION AND AMENDMENTS PLEASE EMAIL BRITTNEY MORRISON AT BRITTNEY.MORRISON@USACE.ARMY.MIL AND MICHELLE NELSEN AT MICHELLE.NELSEN@USACE.ARMY.MIL