FTG257 MISSILE FIELD 2 POWER REDUNDANCY
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
This is a Request for Proposal (RFP) for a standalone 8(a) competitive contract. The purpose of the project is to provide electrical power redundancy to the Missile Field 2 silo interface vaults by adding Automatic Transfer Switches and Main Lug Only distribution panels with Molded Case Circuit Breakers. The SUS A and B switchgear will be physically separated, have enhanced coordination/protection features incorporated, and will be converted from a Main-Tie-Main to a Main Tie-Tie-Main configuration. Additionally, the Power Control and Monitoring System (PCMS) and Power Quality Monitoring System (PQMS) will be extended to Missile Field 2.TO RECEIVE A COPY OF THE SOLICITATION AND AMENDMENTS PLEASE EMAIL BRITTNEY MORRISON AT BRITTNEY.MORRISON@USACE.ARMY.MIL AND MICHELLE NELSEN AT MICHELLE.NELSEN@USACE.ARMY.MIL