FTW480 FIRE PROTECTION REPAIRS
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Army, W2SN ENDIST ALASKA, is soliciting proposals for Fire Protection Repairs (FTW480) at Building 3030, Fort Wainwright, AK. This project aims to bring life safety systems into code compliance. The estimated value is between $10,000,000 and $15,000,000. This is a Total Small Business Set-Aside. Proposals are due by June 23, 2026.
Scope of Work
The project involves bringing Building 3030 life safety systems into code compliance to ensure a complete and usable facility. Key tasks include:
- Removal and replacement of the existing fire suppression system.
- Upgrade of emergency lighting systems.
- Creation of new pathways from office areas located within the warehouse bays.
Contract & Timeline
- Opportunity Type: Solicitation (Request for Proposal - RFP)
- Set-Aside: Total Small Business Set-Aside (FAR 19.5)
- Estimated Magnitude: $10,000,000 to $15,000,000
- Performance Period: Approximately 550 calendar days
- Procurement Method: Two-phase source selection procedures, best value tradeoff
- Solicitation Availability: On or about May 18, 2026, via the PIEE Solicitation Module website.
- Proposal Due Date: June 23, 2026
- Submission Method: Electronic submissions only via the PIEE Solicitation Module website.
Evaluation
Award will be based on a two-phase source selection process with a best value tradeoff. Anticipated evaluation criteria include:
- Phase One: Past Performance (Confidence Assessment) and Technical Approach.
- Phase Two: Design and Construction Approach, Proposed Contract Duration and Summary Schedule, and Price.
Eligibility & Notes
- This is a competitive Small Business set-aside. All Offerors, including joint ventures, must be registered in the System for Award Management (SAM).
- Offerors are responsible for regularly checking the PIEE website for any posted changes or amendments to the solicitation.
- Vendors must register in the PIEE system and establish a Proposal Manager role to submit a proposal.