Full and Open Competition Request for Pad-Mounted Transformer, Vance AFB
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
ASRC Federal Gulf State Constructors, LLC (AFGSC), acting as prime contractor for the Government, is soliciting quotes for a pad-mounted transformer for Vance Air Force Base, OK. This is a Combined Synopsis/Solicitation under Full and Open Competition. Quotes are due by July 1, 2026.
Scope of Work
The requirement is for a pad-mounted transformer meeting specific high voltage (12470 GY / 7200), low voltage (240/120 Delta), fluid (Envirotemp FR3 or equivalent), and electrical/mechanical specifications (e.g., 65°C temperature rise, ONAN cooling). Required features include a separate H0 bushing, liquid level gauge, pressure/vacuum gauge, dial-type thermometer, Schrader valve, drain & sample valve, pressure relief valve, and pad-mount green paint. All materials must comply with the Buy American Act, and the transformer must be free of prohibited materials like mercury, lead, and ozone-depleting chemicals. Delivery is required within 140 days to AFGSC, 140 Channel Street, Bld 288, Enid, OK 73705.
Contract & Timeline
- Type: Firm-Fixed-Price (FFP)
- Set-Aside: None (Full and Open Competition)
- Quote Due: July 1, 2026, at 2:00 PM CST
- Published: June 1, 2026
- Quote Validity: 90 days after the solicitation close date.
- Period of Performance: Delivery within 140 days.
Evaluation & Submission
Quotes will be evaluated based on Low Price Technically Acceptable (LPTA) criteria. Offerors must email quotes to Betty Kliewer (betty.kliewer.ctr@us.af.mil) by the deadline. All interested vendors must be registered and active in SAM.gov at the time of quote submission. Prior to award, the supplier must submit manufacturer product data and transformer submittals for approval.
Important Notes
Funds are not presently available, and award is contingent upon funding. The Government reserves the right to cancel the solicitation without obligation to reimburse offerors. Bidders are responsible for frequently checking SAM.gov for amendments. Attachments include pictures of the damaged transformer, General Terms and Conditions, Representations and Certifications, and a Vendor Form.