FY 25 Mobile Harbor Maintenance Dredging
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
27 March 2025: Bid Abstract and Bid Attendence Sign in Sheet have been uploaded.
RFP documents were initially posted to SAM.GOV on 25 Feb 2025. They are now being posted into PIEE as well. Mobile Harbor Maintenance Dredging. The work to be performed under this contract consists of maintenance dredging of Mobile Harbor. Equipment will be required to dredge to a depth of 52 feet and be complete with crew, management staff and support equipment including tugs and various other floating plants as would normally be expected to support a large dredging operation. Cutterhead dredges will be required to perform thin layer placement in open water sites adjacent to the channel. Hopper dredges will be required to transport dredged material to the Ocean Disposal Management Site south of Dauphin Island, AL. For further details, please see the attached solicitation package.