FY26 CYCLIC HAZARDOUS TREE MAINTENANCE SERVICES

SOL #: 140P1326Q0026Combined Synopsis/Solicitation

Overview

Buyer

Interior
National Park Service
IMR SANTA FE(12100)
SANTA FE, NM, 87504, United States

Place of Performance

Place of performance not available

NAICS

Landscaping Services (561730)

PSC

Tree Thinning Services (F014)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
May 6, 2026
2
Submission Deadline
Jun 8, 2026, 4:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Interior, National Park Service (NPS), specifically IMR SANTA FE(12100), has issued a Combined Synopsis/Solicitation (RFQ) for FY26 Cyclic Hazardous Tree Maintenance Services. This opportunity seeks comprehensive arboricultural and vegetation management services for Rock Creek Park, Washington, DC, to mitigate hazardous tree conditions and enhance public safety. The government anticipates awarding a firm fixed-price purchase order. Quotations are due June 8, 2026, at 12:00 PM ED.

Scope of Work

The contractor will provide full-spectrum tree services, including accessing, removing, pruning, processing, hauling, and disposing of hazardous trees, limbs, storm-damaged trees, and vegetation. This involves large tree removal, technical rigging, climbing, aerial lift operations, crane-assisted removals, hazard reduction, storm response, stump grinding, debris removal, chipping, hauling, traffic/pedestrian control, and site cleanup. Services are required for five (5) eight-hour workdays per month for twelve months, supplementing existing ROCR tree crew efforts. The scope also includes hauling and disposing of stockpiled logs and woody materials from a designated ROCR wood dump site.

Contract & Timeline

  • Opportunity Type: Combined Synopsis/Solicitation (Request for Quote - RFQ)
  • Contract Type: Firm Fixed-Price Purchase Order
  • Set-Aside: Total Small Business Set-Aside (100%)
  • Product Service Code: F014 (Tree Thinning Services)
  • Period of Performance: 365 calendar days after award, anticipated from June 26, 2026, to June 25, 2027. Tasks begin within 10 days after award.
  • Place of Performance: Multiple Government-owned or managed locations within Rock Creek Park, Washington, DC.
  • Published Date: May 6, 2026
  • Offer Due Date: June 8, 2026, at 12:00 PM ED

Submission & Evaluation

Quotations must be submitted via email to brian_dankmeyer@ios.doi.gov. Evaluation will be based on price, technical capability, and past performance. Offerors must provide a Capabilities Statement, Resume and ISA Certified Arborist Certification for the project's Certified Arborist, and three past performance references using the provided FACTS Sheet. A site visit is scheduled for May 22, 2026, at 09:00 AM ED at Rock Creek Park Maintenance Yard (5000 Glover Road, NW Washington, DC 20015); RSVP is required by May 20, 2026, at 12:00 PM ED.

Special Requirements & Notes

  • Eligibility: Offerors must be registered and active in SAM with NAICS code 561730 and possess a Unique Entity Identifier (UEI) at the time of quote submission and award.
  • Personnel: Requires an ISA Certified Arborist as the primary technical contact and a minimum of one on-site supervisor fluent in English.
  • Compliance: Adherence to ANSI A300 Pruning Standards, ISA Best Management Practices, ANSI Z133, OSHA, and federal/state/local safety standards is mandatory. The Service Contract Act Wage Determination (No. 2015-4281, Rev. 36) applies, outlining minimum wage rates and fringe benefits.
  • Attachments: Required attachments include the Performance Work Statement (PWS), SCA Wage Determination, Past Performance FACTS Sheet, and Quality Assurance Surveillance Plan (QASP).
  • Traffic Control: Coordination with COR, U.S. Park Police, and DDOT is required for lane closures, permitted Monday-Friday, 09:00 AM - 02:30 PM, with one week's advance notice.

People

Points of Contact

Files

Files

Download
Download
Download
Download
Download

Versions

Version 1Viewing
Combined Synopsis/Solicitation
Posted: May 6, 2026
FY26 CYCLIC HAZARDOUS TREE MAINTENANCE SERVICES | GovScope