FY26 Willapa Harbor Maintenance Dredging

SOL #: W912DW26Z1ATAPre-Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Army
W071 ENDIST SEATTLE
SEATTLE, WA, 98134-2329, United States

Place of Performance

WA

NAICS

Other Heavy and Civil Engineering Construction (237990)

PSC

Construction Of Dredging Facilities (Y1KF)

Set Aside

No set aside specified

Timeline

1
Posted
Oct 17, 2025
2
Response Deadline
Nov 5, 2028, 5:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Army / USACE Seattle District anticipates a Firm Fixed-Price construction contract for FY26 Willapa Harbor Maintenance Dredging in Willapa Bay, WA. This Pre-Solicitation Notice indicates a project magnitude between $5,000,000 and $10,000,000. The work is expected to commence in July 2026 and conclude by February 15, 2027. A formal solicitation is forthcoming.

Scope of Work

The project involves mechanical (clamshell) dredging to remove approximately 180,000 CY of accumulated sediment from three federal navigation features: the entrance to Tokeland Marina, the entrance channel to Nahcotta, and the Bay Center entrance channel and basin. Minimum dredging depths vary from -10 ft to -15 ft MLLW. An additional 10,000 CY may be dredged in the Palix River thalweg to ensure transit depths.

Dredged material will be disposed of via bottom-dump barge at the Cape Shoalwater and/or South Channel open-water disposal locations within Willapa Bay. In-water work windows are specific to each location, generally from July 16, 2026, through various dates in early 2027 (e.g., Tokeland Marina until Feb 15, 2027; Bay Center until Sep 30, 2026).

Contractors should anticipate challenging conditions due to transit of the unmaintained Willapa Bar, dynamic shoals, strong tidal currents, and severe weather, especially during the performance window which includes the worst season for storms.

Contract & Timeline

  • Type: Firm Fixed-Price Construction Contract
  • Magnitude: $5,000,000 to $10,000,000
  • NAICS: 237990, Dredging and Surface Cleanup (Small Business Size Standard: $37,000,000)
  • Anticipated Work Start: July 2026
  • Anticipated Work Completion: February 15, 2027
  • Published: October 17, 2025
  • Notice Response Date: November 5, 2028 (for this pre-solicitation notice)

Additional Notes

This is a pre-solicitation notice; a formal solicitation with bid submission details will be issued later. Offerors are responsible for monitoring SAM.gov for updates. All contractors proposing on Department of Defense solicitations must be registered in the System for Award Management (SAM) database prior to contract award. For questions regarding this synopsis, contact Geraldine L. Kemp at Geraldine.L.Kemp@usace.army.mil.

People

Points of Contact

Geraldine L. KempPRIMARY
Kimberly M. RobinsonSECONDARY

Files

Files

No files attached to this opportunity

Versions

Version 1Viewing
Pre-Solicitation
Posted: Oct 17, 2025
FY26 Willapa Harbor Maintenance Dredging | GovScope