FY27 Docking Selected Restricted Availability (DSRA) USS ST LOUIS (LCS 19) and USS DONALD COOK (DDG 75)
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Naval Sea Systems Command (NAVSEA) intends to issue a solicitation for FY27 Docking Selected Restricted Availabilities (DSRA) for the USS ST LOUIS (LCS 19) and USS DONALD COOK (DDG 75). These are Chief of Naval Operations (CNO) Availabilities aimed at returning the ships to mission-ready status. The effort will be conducted on a Coast-Wide (East Coast) basis. An RFP is anticipated to be released around January 30, 2026.
Scope of Work
The procurement includes all necessary labor, supervision, production, testing, and quality assurance to prepare for and accomplish the CNO Availabilities. This involves comprehensive ship maintenance, repair, and modernization. The USS ST LOUIS (LCS 19) DSRA is expected to last approximately 10 months (December 2026 - October 2027), while the USS DONALD COOK (DDG 75) DSRA will be approximately 17 months (January 2027 - June 2028). Contractors must possess substantial facilities, including dry dock and pier capabilities, and human resources to manage complex ship maintenance.
Contract & Timeline
- Type: Presolicitation (anticipating two Firm-Fixed-Price contracts)
- Solicitation Number: N00024-26-R-4405
- Duration: USS ST LOUIS (LCS 19) ~10 months; USS DONALD COOK (DDG 75) ~17 months.
- Set-Aside: Not specified; competition will be full and open, potentially limited to homeport or expanded concentrically from Naval Station Mayport, FL, if adequate competition is not found. The current notice indicates a Coast-Wide (East Coast) approach.
- Anticipated RFP Release: On or around January 30, 2026
- Anticipated Award: June 2026
- Published: January 15, 2026
Additional Notes
This is a synopsis issued in accordance with FAR 5.203(a) and is not a commitment to issue a solicitation or award a contract. No proposals are being accepted in response to this synopsis. Interested offerors must monitor https://piee.eb.mil and www.SAM.gov for the official solicitation and any amendments. Registration in the PIEE Solicitation Module and SAM is required for award eligibility. All responsible sources may submit a proposal once the RFP is released.