G Road Water Main Repair

SOL #: SP470326Q0057Sources Sought

Overview

Buyer

DEPT OF DEFENSE
Defense Logistics Agency
DCSO RICHMOND DIVISION #1
RICHMOND, VA, 23237, United States

Place of Performance

Richmond, VA

NAICS

Water and Sewer Line and Related Structures Construction (237110)

PSC

Repair Or Alteration Of Other Non Building Facilities (Z2PZ)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Jun 15, 2026
2
Response Deadline
Jul 4, 2026, 3:59 AM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Defense Logistics Agency (DLA), through its DCSO Richmond Division #1 office, is seeking offers for the G Road Water Main Repair project at Defense Supply Center Richmond, VA. This project involves replacing a damaged section of a 12-inch ductile iron water main to provide a permanent solution. This is a Total Small Business Set-Aside. Quotes are due by July 3, 2026.

Project Objective & Scope

The primary objective is to permanently repair a damaged 12-inch ductile iron water main on G Road, replacing an existing temporary repair clamp. The scope of work includes:

  • Excavation to expose the damaged water main.
  • Installation of up to 20 linear feet of new 12-inch ductile iron water main, adhering to AWWA C600 standards.
  • Disposal of the removed pipe section and temporary clamp.
  • Conducting hydrostatic pressure and leak tests, requiring zero leakage for a minimum of two hours.
  • Backfilling, soil compaction, and restoration of all disturbed surface areas, including topsoil and grass.
  • Scheduling any water main shutdowns during non-peak hours (weekdays 6:00 PM - 6:00 AM, or weekends).

Contractor Requirements & Security

  • Experience: Contractors must demonstrate a minimum of five (5) years of documented experience in municipal water main replacement projects of similar size and scope, supported by details for at least five related projects completed within the last five years.
  • Submittals: The successful contractor will be required to submit a Project Narrative, Quality Control Plan, and Site-Specific Safety Plan post-award.
  • Security: Personnel will require background checks (NACI or equivalent) and must comply with DSCR installation security and access requirements, including mandatory DBIDS pre-enrollment.

Contract Details & Evaluation

  • Contract Type: Firm-Fixed Price (as indicated by required quotation).
  • Period of Performance: The project must be completed no later than 75 days after the Notice to Proceed.
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5).
  • Limitations on Subcontracting: This contract is subject to FAR clause (FEB 2023) (DEVIATION 2021-O0008). For general construction, contractors may not pay more than 85% of the amount to subcontractors that are not similarly situated entities, excluding material costs.
  • Evaluation: Award will be made to the Lowest Priced, Technically Acceptable (LPTA) offeror. Technical acceptability will be assessed based on the vendor's understanding of the work, process for quality/timeliness, and confidence in their ability to perform the SOW. Past performance, pulled from CPARS and SPRS, will be considered part of technical acceptability. Price will be evaluated for reasonableness and completeness.
  • SAM Registration: Required prior to award.

Important Dates & Site Visit

  • Site Visit: June 25, 2026, at 10:00 AM. Attendees must pre-enroll in DBIDS at least 5 business days prior and email the QR code to Orville.Massey@dla.mil no less than three working days prior.
  • Questions Due: June 29, 2026, end of day, via email to Justin.1.Jones@dla.mil.
  • Quotes Due: July 3, 2026, end of day.

Attachments & Additional Notes

Offerors must refer to Attachment 1 - Statement of Work (SOW) for full details, Attachment 2 - Wage Determination for prevailing wage rates (Davis-Bacon Act), and Attachment 3 - Addendum to RFP - Offer Requirements for detailed submission instructions (Technical Volume I with 5-page limit, Pricing Volume II with SF 1449).