GAOA Chantry Phase 2 Recreation Area Improvements

SOL #: 127EAW26Q0019Combined Synopsis/Solicitation

Overview

Buyer

Agriculture
Forest Service
USDA-FS, CSA SOUTHWEST 6
Albuquerque, NM, 871023498, United States

Place of Performance

CA

NAICS

All Other Specialty Trade Contractors (238990)

PSC

Maintenance Of Highways/Roads/Streets/Bridges/Railways (Z1LB)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Apr 7, 2026
2
Submission Deadline
May 7, 2026, 6:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The USDA Forest Service is soliciting quotes for the GAOA Chantry Phase 2 Recreation Area Improvements project within the Angeles National Forest, California. This is a Total Small Business Set-Aside for construction services, with an estimated magnitude between $250,000 and $500,000. The project involves significant demolition, reconstruction, and accessibility upgrades.

Scope of Work

The project requires labor, materials, services, and permits for comprehensive recreation area improvements. Key tasks include:

  • Demolition and removal of an existing 1,660 SF barracks building, including hazardous material testing and potential remediation (lead paint, asbestos).
  • Removal and capping of underground utilities near the barracks footprint.
  • Reconstruction of a parking lot for a future shuttle stop, encompassing repaving, hardened surfaces, retaining walls, railings, signage, and ABA-compliant accessibility improvements.
  • Replacement of existing exterior lighting.
  • Demolition of an existing radio communication tower. The contractor is responsible for providing all necessary personnel, equipment, supplies, and supervision, adhering to applicable specifications and industry standards.

Contract Details

  • Opportunity Type: Combined Synopsis/Solicitation (Request for Quotation - RFQ)
  • Award Type: Firm Fixed Price
  • Set-Aside: Total Small Business Set-Aside (NAICS 238990, $19M size standard)
  • Estimated Magnitude: $250,000 - $500,000
  • Period of Performance: 120 calendar days from Notice to Proceed (NTP). Projected start date is June 1, 2026.
  • Place of Performance: GAOA Chantry Phase 2 Recreation Area Improvements, Arcadia, CA (Angeles National Forest).
  • Key Requirements: Active and valid California contractor's license (Class A, B, or Specialty C with relevant specialization) and active SAM.gov registration. A Bid Bond/Guarantee is required for proposals exceeding $150,000.

Submission & Evaluation

  • Requests for Information (RFIs) Due: April 29, 2026, at 11:00 AM Pacific Time. Submit using the provided RFI Form to Tanya.Torres@usda.gov.
  • Quotes Due: May 7, 2026, at 11:00 AM Pacific Time. Submit via email to Tanya.Torres@usda.gov.
  • Submission Requirements: Completed SF1442, Attachment 3 (Schedule of Items) with detailed pricing, Technical Approach/Past Performance documentation, and Bid Guarantee (if applicable).
  • Evaluation Criteria: Best value to the Government, based on Technical Approach, Past Performance, and Price. No tradeoffs will be conducted.
  • Site Visit: No organized site visit is scheduled; offerors are responsible for site inspection.

Special Considerations

Bidders must adhere to specific resource protection measures, including restrictions on work timing for wildlife, invasive species control, and heritage site protection. A comprehensive Fire Plan outlines contractor responsibilities for fire prevention and suppression, including equipment requirements and operational limits based on Project Activity Levels (PAL). Compliance with Davis-Bacon Act prevailing wage rates for Los Angeles County is mandatory. Invoicing will be processed via the electronic Invoice Processing Platform (IPP) system. Subcontracting is limited, with the prime contractor required to perform a significant portion of the work.

People

Points of Contact

Tanya TorresPRIMARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 1Viewing
Combined Synopsis/Solicitation
Posted: Apr 7, 2026
GAOA Chantry Phase 2 Recreation Area Improvements | GovScope