GAOA Gibb Wash Bridge Replacement, Coronado National Forest
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The USDA Forest Service has issued a Combined Synopsis/Solicitation (RFQ 127EAX26Q0022) for the GAOA Gibb Wash Bridge Replacement project in the Coronado National Forest, Pima County, Arizona. This is a Total Small Business Set-Aside for construction services. The project involves replacing an existing timber bridge with a new steel structural plate arch bridge and associated roadwork. Quotes are due by May 20, 2026, at 5:00 p.m. MST.
Scope of Work
This project requires the removal of an existing 24-foot timber bridge and the installation of a new 28-foot, 1-inch span, 9-foot, 6-inch rise, 28-foot long steel structural plate arch bridge with welded wire headwalls. Associated work includes embankment construction with a mechanically stabilized earth (MSE) wall, realignment of 550 feet of approach road, installation of a 24-inch diameter CMP culvert, guardrail installation, stream channel reconstruction, and obliteration of the existing approach road. Construction must adhere to "Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-14" and Forest Service Supplemental Specifications. A bridge load rating by a Registered Professional Engineer is required post-installation.
Contract Details
- Contract Type: Firm-Fixed Price
- Period of Performance: October 1, 2026, to June 14, 2027. Work must commence within 10 calendar days of the notice to proceed.
- In-Stream Work Window: Restricted to October 1st – December 15th and March 1st – June 14th. No work is permitted from June 15th to September 30th due to wildlife breeding seasons.
- Set-Aside: Total Small Business (NAICS 237310, $45 Million size standard).
- Estimated Value: Not explicitly stated, but a 20% bid guarantee is required for quotes exceeding $150,000.
Submission & Evaluation
- Quotes Due: May 20, 2026, at 5:00 p.m. MST.
- Submission Method: Email to PPS.proposals@usda.gov.
- Site Visit: An organized site visit is scheduled for May 6, 2026, at 10:00 a.m. MST at the Gibb Wash Bridge.
- Eligibility: Contractors must be registered in SAM.gov at the time of quote submission.
- Evaluation Factors: Award will be made to the contractor offering the best value to the Government, based on a comparative evaluation of:
- Technical Proposal: Technical Approach, Project Management & Oversight
- Experience
- Past Performance
- Price Quote: Reasonableness, Price Competition, Price Consistency
Important Notes
Bidders must review the extensive changes detailed in the Project Specifications (Attachment 4), which significantly alter technical requirements and procedures. Compliance with the "Coronado Fire Plan" (Attachment 6) is mandatory, outlining fire prevention and suppression requirements, equipment mandates, and operational restrictions. Prevailing wage rates for Pima County, Arizona (DBA WD AZ20260047) must be adhered to for labor cost calculations. Engineering drawings (Attachment 5) and the Schedule of Items (Attachment 2) are critical for understanding the full scope and preparing pricing.