GAOA GILA BOX DAY USE SITES PHASE II

SOL #: 140L0626B0003Combined Synopsis/Solicitation

Overview

Buyer

Interior
Bureau Of Land Management
NATIONAL OPERATIONS CENTER
DENVER, CO, 80225, United States

Place of Performance

Safford, AZ

NAICS

Other Heavy and Civil Engineering Construction (237990)

PSC

Construction Of Recreation Facilities (Non Building) (Y1PA)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Mar 24, 2026
2
Submission Deadline
Apr 24, 2026, 8:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Bureau of Land Management (BLM), under the Department of the Interior, is soliciting bids for GAOA Gila Box Day Use Sites Phase II construction services. This Total Small Business Set-Aside opportunity involves improvements to recreation facilities at the Gila Box Riparian National Conservation Area in Safford, AZ. The contract will be a Firm Fixed-Price, Single Award type. Sealed bids are due by April 24, 2026, at 2:00 PM Mountain Time.

Scope of Work

This project entails construction of non-building recreation facilities, specifically improvements at various day-use sites within the Gila Box RNCA. Key tasks include:

  • Serna Cabin: Repair/replace perimeter steel railing, information kiosk, picnic tables, and camp grills. Site preparation, regrading, and aggregate base installation for driveway and parking. Trail rehabilitation and new trail construction with clearing and grubbing.
  • Dry Canyon Boat Take-Out: Repair site trail, dirt road, and parking areas; install new railing; remove and replace informational kiosk; construct new trail from toilet building to overflow lot.
  • Old Safford Bridge Picnic Area: Repair dirt road and parking area; remove and replace tables and grills.
  • Spring Canyon Picnic Area: Repair site trail, dirt road, and parking area; replace railing; remove and replace shade structure, concrete picnic tables, and steel camp grills; install a second shade structure.
  • West Entrance Overlook: Replace weathered information kiosk. Performance standards include specific compaction requirements for aggregate base (98% max dry density) and concrete specifications.

Contract Details

  • Contract Type: Firm Fixed Priced (FFP), Single Award Contract.
  • NAICS Code: 237990 - Other Heavy and Civil Engineering Construction (Size Standard: $45M).
  • PSC Code: Y1PA - Construction Of Recreation Facilities (Non Building).
  • Period of Performance: May 1, 2026, to December 27, 2026 (240 days after Notice to Proceed).
  • Estimated Value: Not explicitly stated.

Key Dates & Submission

  • Site Visit: April 1, 2026, at 8:30 AM local time.
  • Questions Due: April 8, 2026, at 2:00 PM Mountain Time.
  • Sealed Bid Due: April 24, 2026, at 2:00 PM Mountain Time.
  • Bid Opening: April 27, 2026, at 2:00 PM Mountain Time (via teleconference).
  • Submission: Proposals must be submitted electronically via email to the listed Point of Contact.

Eligibility & Evaluation

  • Set-Aside: Total Small Business.
  • Eligibility Restriction: Firms involved in the project's design are ineligible.
  • Award Basis: Lowest-priced, responsive, and responsible bidder. No trade-offs will be conducted.
  • Limitations on Subcontracting: Bidders must perform at least 15% of the contract cost with their own employees. A specific form (Attachment 5) is provided for documenting compliance.
  • Registration: Offerors must have a Unique Entity ID (UEI) and an active SAM.gov profile.
  • Bonds: Performance and Payment Bonds (100% of original contract price) are required.

Important Attachments

  • Geotechnical Report (Attachment 2): Provides subsurface conditions and recommendations for design and construction, crucial for understanding site challenges.
  • Wage Determination (Attachment 3): Specifies prevailing wage rates and fringe benefits for heavy construction in Apache, Graham, Greenlee, and Navajo Counties, AZ.
  • Bid Schedule & Estimated Quantities (Attachment 4): Outlines estimated costs and quantities for various scopes of work across different locations, serving as a basis for bid preparation.
  • RFI Form (Attachment 6): Mechanism for submitting questions and receiving official clarifications.

People

Points of Contact

Hicks, KassandraPRIMARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 1Viewing
Combined Synopsis/Solicitation
Posted: Mar 24, 2026
GAOA GILA BOX DAY USE SITES PHASE II | GovScope