Y--GAOA GILA BOX DAY USE SITES PHASE II

SOL #: 140L0626B0003Combined Synopsis/Solicitation

Overview

Buyer

Interior
Bureau Of Land Management
NATIONAL OPERATIONS CENTER
DENVER, CO, 80225, United States

Place of Performance

Safford, AZ

NAICS

Other Heavy and Civil Engineering Construction (237990)

PSC

Construction Of Recreation Facilities (Non Building) (Y1PA)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Mar 24, 2026
2
Last Updated
Apr 23, 2026
3
Submission Deadline
Apr 28, 2026, 8:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Interior, Bureau of Land Management (BLM), through its National Operations Center, has issued an Invitation for Bid (IFB) for GAOA Gila Box Day Use Sites Phase II construction services. This Total Small Business Set-Aside opportunity involves improvements to recreation facilities at various day-use sites within the Gila Box Riparian National Conservation Area in Safford, AZ. Bids are due by April 28, 2026, at 2:00 PM Mountain Time.

Scope of Work

This project entails construction of non-building recreation facilities, including labor, materials, equipment, and supervision for improvements at:

  • Serna Cabin: Repair/replace perimeter steel railing, information kiosk, picnic tables, and camp grills; regrade driveway/parking.
  • Dry Canyon Boat Take-Out: Repair trail, dirt road, and parking; install new railing; replace kiosk; construct new trail.
  • Old Safford Bridge Picnic Area: Repair dirt road and parking; replace tables and grills.
  • Spring Canyon Picnic Area: Repair trail, dirt road, and parking; replace railing, shade structure, picnic tables, and grills; install a second shade structure.
  • West Entrance Overlook: Replace information kiosk. The period of performance is 240 days after Notice to Proceed, anticipated from May 1, 2026, to December 27, 2026.

Contract Details

  • Contract Type: Firm Fixed-Price (FFP), Single Award Contract.
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5).
  • NAICS Code: 237990 - Other Heavy and Civil Engineering Construction (Size Standard: $45M).
  • PSC Code: Y1PA - Construction Of Recreation Facilities (Non Building).
  • Place of Performance: Bonita Creek Road, Safford, AZ 85546.
  • Eligibility: Firms involved in the project's design are ineligible. Bidders must perform at least 15% of the contract cost with their own employees. Performance and Payment Bonds (100%) are required.

Submission & Evaluation

  • Bid Due Date: April 28, 2026, at 2:00 PM Mountain Time.
  • Bid Opening: April 29, 2026, at 2:00 PM Mountain Time via teleconference (new number: 833-436-1163, Conference ID: 971 766 901#).
  • Submission Method: Bids must be submitted electronically via email to Kassandra Hicks (kassandra_hicks@ios.doi.gov) and Matthew Gilger (matthew_gilger@ios.doi.gov). Do not physically mail bids.
  • Evaluation: Award will be made to the lowest-priced, responsive, and responsible bidder; no trade-offs will be conducted.
  • Key Attachments: Geotechnical Report, Bid Schedule with Estimated Quantities, Wage Determination (AZ20260054), and Limitations on Subcontracting Breakout form are available.

Amendments & Clarifications

Amendment 0002 extended the bid due date to April 28, 2026, and the bid opening date to April 29, 2026, updating the conference line details. Amendment 0001 updated the Contracting Officer to Matthew Gilger and added Q&A and site visit sign-in sheet attachments. The Q&A document clarified bid delivery instructions (email only), site access, bridge weight limits, and material specifications.

People

Points of Contact

Hicks, KassandraPRIMARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 3Viewing
Combined Synopsis/Solicitation
Posted: Apr 23, 2026
Version 2
Combined Synopsis/Solicitation
Posted: Apr 16, 2026
View
Version 1
Combined Synopsis/Solicitation
Posted: Mar 24, 2026
View