GAOA Kading Cabin Water System Repair, Helena-Lewis & Clark National Forest

SOL #: 1240LU26Q0060Combined Synopsis/Solicitation

Overview

Buyer

Agriculture
Forest Service
USDA-FS, CSA INTERMOUNTAIN 9
Ogden, UT, 844012310, United States

Place of Performance

Helena, MT

NAICS

Water and Sewer Line and Related Structures Construction (237110)

PSC

Maintenance Of Water Supply Facilities (Z1NE)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Apr 1, 2026
2
Last Updated
Apr 15, 2026
3
Submission Deadline
Apr 22, 2026, 10:30 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The USDA Forest Service is soliciting quotes for the GAOA Kading Cabin Water System Repair project on the Helena-Lewis and Clark National Forest, MT. This is a Total Small Business Set-Aside for commercial construction services, with an estimated value of less than $25,000. The project involves significant upgrades to the cabin's water system. Quotes are due by April 22, 2026, at 4:30 p.m. MDT.

Scope of Work

This project entails the removal and reconstruction of the existing valve box, replacement of all piping, valves, vent, and fittings, and the replacement and relocation of the yard hydrant within 30 feet of its current position. A new splash pad will also be constructed. The contractor is responsible for all labor, materials, tools, and equipment, ensuring compliance with the "Buy American Act" for construction materials. The installation of a liner and import of borrow material, as depicted in Sheets 7 and 8 of the drawings, are for informational purposes only and are not part of this project.

Contract & Timeline

  • Contract Type: Firm-Fixed Price
  • Estimated Value: Less than $25,000
  • Set-Aside: Total Small Business (NAICS 237110, Size Standard $45 Million)
  • Period of Performance: May 18, 2026, to September 30, 2026 (work to commence within 10 calendar days of notice to proceed)
  • Response Due: April 22, 2026, at 4:30 p.m. MDT
  • Published Date: April 15, 2026

Submission & Evaluation

Quotes must be submitted electronically to PPS.proposals@usda.gov. Submissions must include pricing for all items listed in Attachment 2 – Schedule of Items (SOI) and adhere to all submission instructions (Pages 20-22 of the solicitation). Evaluation will be based on a comparative methodology, considering Technical Approach, Experience, Past Performance, and Price Quote. Award will be made to the contractor offering the best value to the Government. Quotes must be held firm for 60 calendar days. All contractors must be registered in SAM.gov at the time of quote submission.

Key Clarifications & Notes

  • Site Visit: No organized site visit; prospective quoters are responsible for visiting the site. The site is accessible for large trailers, and onsite camping is permitted.
  • Questions: Questions were due by April 13, 2026.
  • Prevailing Wages: The project is subject to Davis-Bacon Act prevailing wage requirements, as detailed in General Decision Number MT20260048 for Powell County, Montana. Bidders must account for these rates.
  • Rock Encountered: Rock may be present during trenching, but blasting is not anticipated.

People

Points of Contact

Judith MartinPRIMARY
Alisha KnaubSECONDARY

Files

Files

Download
Download
Download
Download
Download

Versions

Version 2Viewing
Combined Synopsis/Solicitation
Posted: Apr 15, 2026
Version 1
Combined Synopsis/Solicitation
Posted: Apr 1, 2026
View