GAOA, Road Striping and Signage 2.0

SOL #: 127EAW26Q0046Combined Synopsis/Solicitation

Overview

Buyer

Agriculture
Forest Service
USDA-FS, CSA SOUTHWEST 6
Albuquerque, NM, 871023498, United States

Place of Performance

CA

NAICS

Highway (237310)

PSC

Repair Or Alteration Of Highways/Roads/Streets/Bridges/Railways (Z2LB)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Jun 18, 2026
2
Submission Deadline
Jul 18, 2026, 6:00 AM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The USDA Forest Service has issued a Combined Synopsis/Solicitation (RFQ) 127EAW26Q0046 for the GAOA, Road Striping and Signage 2.0 project at Sequoia National Forest, California. This acquisition is a Total Small Business Set-Aside with an estimated magnitude between $250,000 and $500,000. Quotes are due by July 7, 2026, at 11:00 AM Pacific Time.

Scope of Work

The contractor shall furnish all necessary labor, equipment, and materials to restripe approximately 76 miles of paved roads and install/replace roadway signs on existing and new posts. This work supports safety and efficiency improvements on specific roads within the Sequoia National Forest, including 14S11 Horse Corral, 21S03 Blackrock, 22S05 Sherman Pass, and 22S82 Lloyd Meadow. The scope includes mobilization, traffic control, various pavement markings (e.g., double yellow center stripe, stop bars, lettering), and a range of signs (STOP, speed limit, object markers, directional, recreational, customized traffic control). Work must comply with applicable specifications, including FP-14, MUTCD, and Forest Service Manuals.

Contract Details

  • Type: Firm Fixed Price (Request for Quotation)
  • Set-Aside: Total Small Business Set-Aside
  • NAICS Code: 237310 – Highway, Street, and Bridge Construction (Small Business Size Standard: $45M)
  • Magnitude: Between $250,000 and $500,000
  • Period of Performance: Work to commence within 10 calendar days after Notice to Proceed, with completion required within 75 calendar days after Notice to Proceed (estimated start August 2026).
  • Place of Performance: Sequoia National Forest, Tulare County, California.
  • Key Requirements: Offerors must have an active entity registration at SAM.gov. Bid guarantees are required for projects over $35,000, with specific requirements for projects over $150,000.

Submission & Evaluation

  • Quotes Due: July 7, 2026, 11:00 AM Pacific Time.
  • Requests for Information (RFIs) Due: July 7, 2026, 11:00 AM Pacific Time. RFIs must be submitted in writing via the provided RFI Form to Tanya.Torres@usda.gov.
  • Submission Content: Quotes must be submitted electronically and include a completed SF 1442, Schedule of Items (Attachment 3), Technical Approach, and Past Performance information.
  • Evaluation: Award will be made to the offeror representing the best value to the Government, based on Technical Approach, Past Performance, and Price. Award will not necessarily be made to the lowest-priced offeror.

Special Conditions

No organized site visit will be held; contractors are responsible for their own site inspection. The project requires adherence to Davis-Bacon Act prevailing wage rates for relevant California counties (Fresno, Tulare, Kern, Inyo, Mono). Contractors must comply with a detailed Fire Plan, including specific equipment, communication, and operational restrictions based on Project Activity Levels (PALs). Numerous modifications to the FP-14 Standard Specifications are outlined in the Supplemental Specifications document, which bidders must consult. Administrative requirements include invoicing via the IPP and specific insurance coverages.

Contact Information

Primary Contact: Tanya Torres (tanya.torres@usda.gov)

People

Points of Contact

Tanya TorresPRIMARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 1Viewing
Combined Synopsis/Solicitation
Posted: Jun 18, 2026
GAOA, Road Striping and Signage 2.0 | GovScope