GAOA Sam Owen Campground Improvements, Idaho Panhandle National Forest
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The USDA Forest Service is soliciting quotes for Sam Owen Campground Improvements on the Idaho Panhandle National Forest in Sandpoint, ID. This is a Total Small Business Set-Aside for commercial construction services, with an estimated value between $1M and $5M. The project involves comprehensive campground reconstruction. Quotes are due June 18, 2026, by 5:00 p.m. PDT.
Opportunity Details
This is a combined synopsis/solicitation (Request for Quotation - RFQ) for commercial construction, prepared in accordance with FAR Part 12. It is issued under NAICS 237990 (Other Heavy and Civil Engineering Construction) with a $45 Million small business size standard. The acquisition is a Total Small Business Set-Aside.
Scope of Work
The project entails the construction and reconstruction of the Sam Owen Campground. Key tasks include:
- Site Preparation: Removal of existing improvements, clearing, grubbing, excavation, and embankment.
- Infrastructure: Construction/reconstruction of roads, parking areas, parking spurs, and camp sites, including gravel and asphalt paving.
- Utilities: Reconstruction/replacement of water, sewer, and electrical connections.
- Site Amenities: Installation of wheel stops, road and site signage, gates, barrier boulders, picnic tables, fire rings, and storage boxes.
- Technical Specifications: Adherence to detailed construction plans (Attachment 4) and supplemental specifications (Attachment 3) covering material requirements, quality control, and survey/staking.
- Schedule of Items (Attachment 2): Details base work and potential options for surveying, fencing, retaining walls, and additional water/sewer components.
Contract & Timeline
- Contract Type: Firm-Fixed Price
- Period of Performance: September 8, 2026, to October 31, 2027
- Estimated Value: $1,000,000 to $5,000,000
- Place of Performance: Sandpoint, ID
- Published Date: June 3, 2026
- Site Visit: An organized site visit is scheduled for June 17, 2026, at 10:00 a.m. PDT. Contractors are urged to inspect the site.
- Questions Due: June 18, 2026
- Proposal Due: June 18, 2026, 5:00 p.m. PDT
Submission & Evaluation
- Submission Method: Email proposals to PPS.proposals@usda.gov.
- Required Documents: Signed SF-1442, Schedule of Items (Attachment 2), acknowledgement of amendments, and a scanned copy of Bid Guarantee (20% required if quote exceeds $150,000).
- Evaluation Criteria: Best value to the Government, using a comparative evaluation based on Technical and Project Management, Experience, Past Performance, and Price Quote.
- Eligibility: Contractors must be registered in SAM.gov at the time of quote submission.
- Wage Determination: Bidders must adhere to prevailing wage rates and fringe benefits for Bonner County, ID, as outlined in Attachment 5.
Contact Information
- Primary: Judith Martin (judith.martin@usda.gov)
- Secondary: Kellie Shaw (kellie.shaw@usda.gov, 208-313-3852)