Z--GAOA SOAP GULCH ROAD

SOL #: 140L3626Q0021Solicitation

Overview

Buyer

Interior
Bureau Of Land Management
MONTANA STATE OFFICE
BILLINGS, MT, 59101, United States

Place of Performance

Place of performance not available

NAICS

Highway (237310)

PSC

Maintenance Of Highways/Roads/Streets/Bridges/Railways (Z1LB)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Apr 28, 2026
2
Last Updated
Jun 4, 2026
3
Submission Deadline
Jun 22, 2026, 7:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Bureau of Land Management (BLM), Department of the Interior, is soliciting proposals for the GAOA Soap Gulch Road Re-Surfacing and Re-Construction project in Silver Bow County, Montana. This Total Small Business Set-Aside opportunity involves approximately 9 miles of road maintenance and improvements. Proposals are due by June 22, 2026, at 1:00 PM MDT.

Scope of Work

The project entails comprehensive road maintenance, including clearing and grubbing, road reconstruction, widening, drainage improvements, dip construction, culvert installation, and turnout construction. The primary goal is to correct existing drainage deficiencies and enhance road width for improved long-term performance and access. Notably, the requirement for retaining wall construction has been removed by Amendment 0004. Detailed technical requirements are provided in the updated Supplemental Specifications (Attachment 1) and Drawings (Attachment 2).

Contract & Timeline

  • Contract Type: Firm Fixed-Price (FFP), Single Award Construction Contract.
  • Estimated Magnitude: Between $250,000 and $350,000.
  • Period of Performance: July 1, 2026, to August 31, 2027.
  • Proposal Due Date: June 22, 2026, 1:00 PM MDT.
  • Published Date: June 4, 2026.

Evaluation

Award will be made to the responsible firm whose quote is most advantageous to the Government, considering price and other factors. Prior Demonstrated Experience is significantly more important than cost or price. Projects involving retaining wall construction or repair will no longer be evaluated more favorably.

Submission Requirements

Quotes must be submitted electronically to jorge_alvarez@ios.doi.gov. Submissions require three volumes: Required Documentation, Prior Demonstrated Experience, and Pricing. Offerors must acknowledge receipt of all amendments, particularly Amendment 0004, as detailed in Block 11 of the Standard Form 30.

Additional Notes

A site visit was strongly urged. The solicitation includes a Wage Determination for Highway Construction Projects in Montana Statewide, which bidders must use for labor cost calculations. Contact Jorge Alvarez at jalvarez@blm.gov for inquiries.

People

Points of Contact

Alvarez, JorgePRIMARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 4Viewing
Solicitation
Posted: Jun 4, 2026
Version 3
Solicitation
Posted: May 22, 2026
View
Version 2
Solicitation
Posted: May 13, 2026
View
Version 1
Solicitation
Posted: Apr 28, 2026
View
Z--GAOA SOAP GULCH ROAD | GovScope