Garrison Dam Spillway – West Abutment Lignite Drain
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
The Bid Abstract is posted.
______________________________________________________________________
** UPDATE 29 OCT 2025 - Results of Step 1 - Technical Evaluation of the Two Step IFP process
The following firm submission has been identified as being technically acceptable and shall proceed to Step 2 of the Two Step IFB process.
RME LTD., LLC – 115 IVERNESS DR EAST SUITE 100, ENGLEWOOD, CO 80112
Amendment 0002:
The due date for Step One offers has been extended to 8 July 2025.
Amendment 0001:
The updates made to the 00 22 00 are listed within the conformed copy of the solicitation in Amendment 0001.
__________________________________________________________________________________________________________
Solicitaiton and associated documents are posted below. Please see attachments.