Generator, Engine
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Defense Logistics Agency (DLA) Weapons Support (Warren) is conducting a Sources Sought/Request for Information (RFI) to identify potential sources capable of supplying a Generator, Engine (National Stock Number: 2920-00-441-8137, US Government Part Number: 11655469, OEM Part Number: 30B95-3-C). This item is for the M51/M74/M88 Recovery Vehicle. This is for informational purposes only and is not a formal solicitation. Responses are due by May 8, 2025.
Scope of Work
The DLA anticipates a 5-year Long-Term Contract for this item, with a minimum quantity of 110 EA and a maximum of 140 EA. The first delivery order quantity is expected to be 110 EA, with FOB Destination.
Information Requested
Interested companies should submit:
- Company Name, Address, Point of Contact, CAGE Code, and Business Size.
- A brief capability statement detailing experience in manufacturing similar components for military applications.
- Manufacturing capabilities (e.g., machining, casting, assembly).
- Quality System Certification (e.g., ISO 9001:2015 or equivalent).
- Estimated lead time for first article and subsequent production units.
- Rough Order of Magnitude (ROM) cost estimate.
Key Requirements & Source Approval
This opportunity is EXPORT CONTROLLED. Access to technical data requires certification under the United States/Canada Joint Certification Program (JCP). Potential sources are strongly encouraged to review the Source Approval Program (SAP) information provided, including links to the TACOM website for details on becoming an approved source.
The attached document, "Approved Source Process.pdf," outlines the eight major components required for a Source Approval Request (SAR) package. These include a cover letter, manufacturer brochure, statement of manufacturing operations, complete drawings, quality system documentation, special processes/materials control plans, and a qualification test plan. SAR candidates must demonstrate their item is 'as-good or better' than the currently approved part.
Contract & Timeline
- Type: Sources Sought / Request for Information
- Anticipated Contract Type: 5-Year Long-Term Contract
- Set-Aside: None specified
- Response Due: May 8, 2025, 5:00 PM ET
- Published: April 23, 2026
Submission Instructions
All responses must be submitted electronically to Sabrina Krafft at sabrina.krafft@dla.mil.
Additional Notes
This Sources Sought is for market research only and does not constitute a commitment to procure.